TOWER AND CORNER
CORNER POST ON
LAG SCREW
5/16" WASHER
DISTANCE BETWEEN
(SKIP AHEAD TO STEP 15
DETAILS ON THE 59"
IF YOU NEED MORE
DIMENSION.)
59"
POST ON PLAY SET IS 59".
FRONT OF TOWER
5/16 X 3-1/2"
PUT 5/16" X 3-1/2" LAG
SCREWS IN THE BOTTOM
HOLES OF THESE BOARDS
ONCE YOU LEVEL AND
SQUARE THE TOWER.
NOTE HOLES IN THIS
BOARD. USE THEM TO
ORIENT YOURSELF
BEFORE PUTTING IN
LAG SCREWS.
C
2: ONCE THE FRAME IS LEVEL, SQUARE, AND SET INTO POSITION; GO BACK AND INSERT THE 5/16 X 3-1/2" LAG
B
A
SCREWS AND 5/16" WASHERS IN THE REMAINING HOLES OF THE 2 X 6 PARTS SHOWN BELOW. NOTE: THERE WILL NOT
BE ANY PREDRILLED HOLES IN THE CORNER POSTS FOR THE LAG SCREWS. LAG SCREWS ARE SELF-TAPPING.
1: PLACE THE FRAME IN ITS FINAL POSITION AND FOLLOW THE PROCEDURES AT THE FRONT OF THE MANUAL TO LEVEL
AND SQUARE THE STRUCTURE. TO SQUARE AND LEVEL THE DECK OF THE TOWER TO THE DECK OF THE FORT PLACE A
DECK BOARD ACROSS THE 2 X 4'S. THEN PLACE A 2 X 4 X 66" BRIDGE RAIL ON TOP OF THE DECK BOARD AND ON
TOP OF THE FORT DECK. PLACE A LEVEL ON TOP OF THE 66" BRIDGE RAIL, THEN MAKE THE DECKS LEVEL TO ONE
ANOTHER.
D
STEP 7: LAG SCREWS
146