1: PLACE THE 2 X 4 X 70" UPPER LEVEL STEPS/RAILING BOARD (3 HOLES ON CENTER) AT
THE TOP OF THE REAR CORNER POSTS. THIS BOARD WILL GET ATTACHED TO THE 2ND
HOLE DOWN FROM THE TOP OF THE POSTS. THE T-NUT FOR THIS BOARD SHOULD BE ON
THE INSIDE OF EACH POST ALREADY. FASTEN THE UPPER LEVEL RAILING BOARD TO THE
REAR CORNER POSTS WITH 5/16" X 4-1/2" HEX BOLTS AND 5/16" WASHERS.
2: PLACE THE 2 X 6 X 70" SANDBOX BOARD (OFFSET UP) AT THE BOTTOM OF THE REAR
CORNER POSTS. FASTEN THE TOP HOLES IN THE SANDBOX BOARD TO THE REAR CORNER
POSTS WITH 5/16" X 4-1/2" HEX BOLTS AND 5/16" WASHERS.
3: PLACE THE 4 X 4 X 70" UPPER LEVEL UNDER DECK SUPPORT DIRECTLY UNDERNEATH THE
UPPER LEVEL DECK SUPPORTS. ATTACH THE UNDER DECK SUPPORT TO THE REAR CORNER
POSTS WITH 3/8" X 5" LAG SCREWS AND 3/8" WASHERS.
STEP 23: UPPER LEVEL - RAILING & UNDER DECK SUPPORT
WASHER
5/16"
HEX BOLT
LAG SCREW
UPPER LEVEL STEPS/RAILING BOARD
(3 HOLES ON CENTER)
3/8" X 5"
UNDER DECK SUPPORT
(OFFSET UP)
2 X 4 X 70"
4 X 4 X 70" UPPER LEVEL
SANDBOX
BOARD
5/16" WASHER
5/16" X
4-1/2"
4-1/2"
HEX BOLT
2 X 6 X 70"
5/16" X
3/8"
WASHER
75