STEP 21: IRON DUCTILE SWING HANGERS
1: LINE UP THE HOLES OF THE IRON DUCTILE SWING HANGERS WITH THE HOLES IN THE SWINGBEAM. IF YOUR BEAM
IS BOWED SLIGHTLY PLACE THE BOW SIDE UP; THE SWING HANGERS WILL BE ON THE BOTTOM.
2: FASTEN THE SWING HANGER TO THE SWING BEAM USING 7" CARRIAGE BOLTS WITH TORQUE WASHERS, AND 3/8"
WASHERS WITH 3/8" LOCK NUTS.
3: PLACE BOLT CAPS OVER EXPOSED THREADS.
M
3/8" LOCK NUT
BOLT CAP
DETAIL M
SCALE 1 : 8
7" CARRIAGE BOLT
TORQUE WASHER
3/8" WASHER
IRON DUCTILE
SWING HANGER
60
Summary of Contents for 01-0033-AP-1
Page 6: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 9: ......
Page 70: ...EXTREME TUBE SLIDE 03 0014 1 PICTURE DESCRIPTION QTY 35 ...
Page 137: ...APPENDIX 102 ...