STEP 49: WAVE SLIDE
1: PLACE THE SLIDE IN THE OPENING AT THE FRONT OF THE FORT. LAY THE SLIDE ON THE DECK WITH THE LIP
EXTENDING ONTO THE DECK.
2: PREDRILL 1/8" HOLES INTO THE DECK BOARDS AT THE SCREW LOCATIONS.
3: ATTACH THE SLIDE TO THE DECK WITH 1-1/4" PAN HEAD SCREWS.
**DO NOT OVERTIGHTEN**
#14 X 1-1/4" PAN HEAD SCREW
**DO NOT OVERTIGHTEN**
91
Summary of Contents for 01-0033-AP-1
Page 6: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 9: ......
Page 70: ...EXTREME TUBE SLIDE 03 0014 1 PICTURE DESCRIPTION QTY 35 ...
Page 137: ...APPENDIX 102 ...