20
EN
PRESENTATION
Dear Customer,
Thank you for purchasing the Gorenje heat pump for heating sanitary water, one of the most advanced appliances
in its class. Its materials, design and testing were made in compliance with related applicable standards.
Please read these instructions carefully before use in order to prevent potential problems that may cause damage
to the product.
Keep this Manual for future reference, as a source of information on the details of the heat pump operation or its
maintenance. Instructions for installation and use can also be found on our website http://www.gorenje.com .
Of course, you can always contact any of our experienced authorised servicing technicians for occasional
maintenance
AREA OF USE
This appliance is designed for production of sanitary water in households and at premises where daily
consumption of hot water (40 °C) does not exceed 240 l to 300 l. The appliance must be connected to water
supply mains and to the power supply grid.
In case of installing the indoor unit – the boiler in a room with a bathtub or shower tub, take into account the
requirements defined in the IEC 60364-7-701 standard (VDE 0100, Teil 701). To mount the unit on the wall, use
special wall bolts with a nominal diameter of min. 8 mm and always mount the unit in an upright position. Make
sure the mounting location on the wall is adequately reinforced if the wall is not strong enough. We recommend
leaving enough space between the floor and the unit as to provide easy access to the Mg anode (se Installation).
If not, the unit will need to be dismounted from the wall before servicing.
The heat pump may not be used for purposes other than those defined in these Instructions. The unit is not
designed for industrial use or use in rooms where corrosive or explosive substances are present.
The manufacturer shall not assume any liability for damages caused by incorrect installation or misuse that are
not in compliance with the Instructions for installation and use.
The
instructions for use
are a component and important part of this product and must be delivered to the
customer. Read the warnings carefully, as they contain important directions related to safety during installation,
use and maintenance.
Keep these Instructions for later use.
The marking of the indoor unit – the boiler is stated on the nameplate located on the bottom side of the unit,
between both inlet pipes for sanitary water. The marking of the outdoor unit – the aggregate is located next to the
electric terminal plate.
Once the packaging is removed, check the contents. When in doubt, contact your dealer. Never let children play
with the packaging parts (clamping, plastic bags, expanded polystyrol, etc.) as these present a potential risk. Do
not dispose of these materials in the environment.
STORAGE AND TRANSPORT
Store the outdoor unit – the aggregate of the heat pump in an upright position, in a clean and dry place. Store the
indoor unit – the boiler in an upright position, in a clean and dry place.
Summary of Contents for TC120SNE
Page 1: ...SL EN NAVODILA ZA UPORABO INSTRUCTIONS FOR USE TC 120 150 SPLIT...
Page 2: ...2...
Page 35: ...35...
Page 36: ...05 2017 561331...