background image

NUMBER OF 

WORKERS /

TRACK

TROLLEY 

SADDLE 

(FT)

SPAN 

(FT)

MODEL NUMBER

MAST

DIAMETER 

(IN)

**FOOTING 

DEPTH (IN)

**FOOTING 

WIDTH (FT)

APPROX. 

WEIGHT 

(LBS)

***ANCHOR 

BOLT LOAD 

(LBS)

2

14

8

10

12

14

16

18

20

22

24

26

28

30

TTSA-FS-WC-B1-2P-8-14

TTSA-FS-WC-B1-2P-10-14

TTSA-FS-WC-B1-2P-12-14

TTSA-FS-WC-B1-2P-14-14

TTSA-FS-WC-B1-2P-16-14

TTSA-FS-WC-B1-2P-18-14

TTSA-FS-WC-B2-2P-20-14

TTSA-FS-WC-B2-2P-22-14

TTSA-FS-WC-B2-2P-24-14

TTSA-FS-WC-B2-2P-26-14

TTSA-FS-WC-B2-2P-28-14

TTSA-FS-WC-B2-2P-30-14

12.75

12.75

12.75

12.75

14

14

14

14

14

16

16

18

48

48

48

48

48

48

48

48

48

48

48

48

4.5

4.75

5

5.5

5.75

6

6.25

6.5

6.75

7

7.25

7.5

974

1045

1103

1254

1847

1916

2134

2622

2729

3046

3153

3697

4481

5788

7113

8579

8035

9224

10619

12714

14173

6522

7169

6589

16

8

10

12

14

16

18

20

22

24

26

28

30

TTSA-FS-WC-B1-2P-8-16

TTSA-FS-WC-B1-2P-10-16

TTSA-FS-WC-B1-2P-12-16

TTSA-FS-WC-B1-2P-14-16

TTSA-FS-WC-B1-2P-16-16

TTSA-FS-WC-B1-2P-18-16

TTSA-FS-WC-B2-2P-20-16

TTSA-FS-WC-B2-2P-22-16

TTSA-FS-WC-B2-2P-24-16

TTSA-FS-WC-B2-2P-26-16

TTSA-FS-WC-B2-2P-28-16

TTSA-FS-WC-B2-2P-30-16

12.75

12.75

12.75

12.75

14

14

14

14

16

16

18

18

48

48

48

48

48

48

48

48

48

48

48

48

4.5

4.75

5

5.5

5.75

6

6.25

6.5

6.75

7

7.25

7.5

1041

1112

1170

1321

1956

2025

2243

2731

3064

3171

3531

3838

4464

5770

7096

8561

8007

9195

10590

12686

5877

6506

6089

6841

18

8

10

12

14

16

18

20

22

24

26

28

30

TTSA-FS-WC-B1-2P-8-18

TTSA-FS-WC-B1-2P-10-18

TTSA-FS-WC-B1-2P-12-18

TTSA-FS-WC-B1-2P-14-18

TTSA-FS-WC-B1-2P-16-18

TTSA-FS-WC-B1-2P-18-18

TTSA-FS-WC-B2-2P-20-18

TTSA-FS-WC-B2-2P-22-18

TTSA-FS-WC-B2-2P-24-18

TTSA-FS-WC-B2-2P-26-18

TTSA-FS-WC-B2-2P-28-18

TTSA-FS-WC-B2-2P-30-18

12.75

12.75

14

14

14

14

14

16

16

18

18

20

48

48

48

48

48

48

48

48

48

48

48

48

4.5

4.75

5

5.5

5.75

6

6.25

6.5

6.75

7

7.25

7.5

1108

1179

1733

1887

2065

2134

2352

3083

3189

3566

3673

4824

4446

5752

5537

6721

7978

9167

10562

5249

5861

5514

6071

5860

20

8

10

12

14

16

18

20

22

24

26

28

30

TTSA-FS-WC-B1-2P-8-20

TTSA-FS-WC-B1-2P-10-20

TTSA-FS-WC-B1-2P-12-20

TTSA-FS-WC-B1-2P-14-20

TTSA-FS-WC-B1-2P-16-20

TTSA-FS-WC-B1-2P-18-20

TTSA-FS-WC-B2-2P-20-20

TTSA-FS-WC-B2-2P-22-20

TTSA-FS-WC-B2-2P-24-20

TTSA-FS-WC-B2-2P-26-20

TTSA-FS-WC-B2-2P-28-20

TTSA-FS-WC-B2-2P-30-20

12.75

12.75

14

14

14

14

16

16

18

18

20

20

48

48

48

48

48

48

48

48

48

48

48

48

4.5

4.75

5

5.5

5.75

6

6.25

6.5

6.75

7

7.25

7.5

1175

1246

1842

1996

2174

2243

2718

3208

3600

3707

4720

5032

4428

5734

5509

6693

7950

9138

4358

5233

4954

5496

5175

5833

22

8

10

12

14

16

18

20

22

24

26

28

30

TTSA-FS-WC-B1-2P-8-22

TTSA-FS-WC-B1-2P-10-22

TTSA-FS-WC-B1-2P-12-22

TTSA-FS-WC-B1-2P-14-22

TTSA-FS-WC-B1-2P-16-22

TTSA-FS-WC-B1-2P-18-22

TTSA-FS-WC-B2-2P-20-22

TTSA-FS-WC-B2-2P-22-22

TTSA-FS-WC-B2-2P-24-22

TTSA-FS-WC-B2-2P-26-22

TTSA-FS-WC-B2-2P-28-22

TTSA-FS-WC-B2-2P-30-22

12.75

12.75

14

14

14

16

16

16

18

18

20

20

48

48

48

48

48

48

48

48

48

48

48

48

4.25

4.75

5

5.5

5.75

6

6.25

6.5

6.75

7

7.25

7.5

1241

1312

1951

2106

2284

2624

2843

3333

3741

3848

4928

5240

4410

5717

5480

6664

7921

3757

4341

5217

4936

5478

5148

5807

6

10/12 Rev. E

Chart 1C. 

 

Two Person, Dual Track Free Standing Swing Arm *Standard Configurations.

* All Standard Configurations are based on a 900 lb. MAAF (for ANSI Z359.13 or Z359.14 rated lanyard or SRL) or 900 lb. MAF (for other rated lanyards or SRLs)

** Footing size is based on a 1.5 overturning safety factory of proof loading

*** Anchor bolt load is based on proof load (1.25 * 900 lb (MAAF or MAF) + dead load)

Summary of Contents for TETHER TRACK TTSA

Page 1: ...ntenance Manual Month Year Gorbel Dealer Date Tether Track Swing Arm Systems Gorbel Customer Order No Serial No TTSA FS TTSA Distributed by Engineered Fall Protection Sales EngineeredFallProtection co...

Page 2: ...tion 10 Step 5 Tether Track Installation 10 Step 6 Trolley Installation 11 Step 7 Friction Brake Installation Optional 11 13 Step 8 Drive Installation Optional 14 Step 9 Electrification Installation O...

Page 3: ...rolley within our enclosed track all mounted on a freely pivoting hinge allows for the maximum ease of movement These proven designs have been utilized in Gorbel s crane products for many years Refer...

Page 4: ...ximum average arresting force and the rated maximum arresting force of the Tether Track Swing Arm Anchor System shall not be exceeded If the lanyard or SRL connected to the Tether Track Swing Arm does...

Page 5: ...zed or an engaged friction brake is required when more than one person is using the Swing Arm 11 Only SRLs with sufficient reserve line shall be used when more than one person is using the Swing Arm D...

Page 6: ...1 2 FOR B1 6 7 3 3 1 2 11 16 HOLE FOR 5 8 BOLT 5 4 13 16 HOLE FOR 3 4 BOLT 8 8 1 4 B1 BRACKET B2 BRACKET PULL THRUST Diagram 1A Wall Mounted Swing Arm MAST DIA SPAN TS WIDTH DEPTH Diagram 1B Free Stan...

Page 7: ...B1 1P 30 18 8 625 12 75 12 75 12 75 12 75 14 14 14 14 16 16 18 6 48 48 48 48 48 48 48 48 48 48 48 6 3 4 4 25 4 5 4 5 4 75 5 5 25 5 5 5 75 6 25 6 25 776 1038 1161 1206 1268 1905 1982 2150 2237 2676 324...

Page 8: ...TSA FS WC B2 2P 30 18 12 75 12 75 14 14 14 14 14 16 16 18 18 20 48 48 48 48 48 48 48 48 48 48 48 48 4 5 4 75 5 5 5 5 75 6 6 25 6 5 6 75 7 7 25 7 5 1108 1179 1733 1887 2065 2134 2352 3083 3189 3566 367...

Page 9: ...sembly to formed channel using hardware provided diagram 2B Be sure that thrust washers are in position Tighten nuts on pivot bolt until lockwashers are compressed being sure boom freely rotates 2 5 C...

Page 10: ...concrete must cure seven 7 days prior to mast installation Foundation concrete must cure 28 days prior to using Swing Arm C Proceed to Step 3 2 page 9 for mast installation and plumbing STOP Do not p...

Page 11: ...ude above base plate If base plate hole diameter is greater than bolt diameter plus 1 4 refer to AISC Design Guide 1 for minimum washer size and thickness recommendations C Install anchor bolts and ha...

Page 12: ...n on clamping bolts two at each track support Thread clamping bolts with jam nuts into track supports and tighten until snug against track Lock clamping bolt into place with jam nut diagram 5A 5 3 Ins...

Page 13: ...ON BRAKE INSTALLATION OPTIONAL Brake Caliper Installation 7 1 If brake caliper lever is not assembled in orientation show diagram 7A remove cotter pin adjuster nut flat washer lever mounting bolts and...

Page 14: ...agram 7E 7 6 Slide rotor between brake pads as shown in diagram 7F Loosen 1 2 caliper bracket mounting bolts and position caliper so that rotor overlaps brake pads by 1 16 Tighten 1 2 bolts to 50 ft l...

Page 15: ...16 18 1 5 long hex bolt and lock nut to attach lever weldment to the brake release bracket Attach pull chains to the lever weldment using hardware show in diagram 7J 7 9 Use turnbuckle to adjust cabl...

Page 16: ...t 8A for proper torque rating Friction Clutch Installation During normal operation adjustment to compensate for friction lining wear may be necessary The frequency of these adjustments will be depende...

Page 17: ...d voltage of motor 9 8 Reference drawing E and E 1 for pendant and enclosure schematics when required 9 9 Attach limit switch tab to bottom of vertical member of Swing Arm diagram 9C so that is does n...

Page 18: ...ll bolts are tight and lockwashers are compressed 11 2 Grease all fittings use Lubriplate 630 AA or equivalent 11 3 If necessary touch up system with paint provided 11 4 Install yellow rubber tracdoms...

Page 19: ...le must be the minimum SRL length above the workers dorsal ring Minimum TS WS WH 1 ft SL 10 6 1 2 17 ft Here 1 ft is taken as the distance from the dorsal ring to the worker s full height The trolley...

Page 20: ...event of a fall the Swing Arm may move to vertically align the activated lifeline and may rotate up to an additional 10 degrees To reduce the potential of a second worker from falling extra payout li...

Page 21: ...force rating of the connected lanyard or SRL Note the static proof test load must be based on the maximum average arresting force rating of the Swing Arm multiplied by the maximum number of workers Ea...

Page 22: ...plication of force through the lanyard locked SRL or a tagline will begin to rotate the Swing Arm Allow the Swing Arm to continue to rotate until it is near the overhead position and then gently apply...

Page 23: ...5 Do not exceed the rated load capacity number of workers or maximum average arresting force of the Swing Arm Tether Track Anchor System Labels with this information are located on either side of the...

Page 24: ...pressly excluded E DEALER OR DISTRIBUTOR NOT AN AGENT Gorbel and Purchaser agree that Purchaser has been put on notice that dealer or distributor is not Gorbel s agent in any respect for any reason Go...

Page 25: ...by their manufacturers If the answer to any of these questions on the checklist is no remove yourself from the fall hazard and report the issue to the proper supervisor 23 10 12 Rev E YES NO AUTHORIZ...

Page 26: ...ck pivot points for being out of plumb and shim as necessary For drive option verify normal operation Check clutch slippage by applying a horizontal 40 pound force at the end of the Swing Arm Tighten...

Page 27: ...measuring device ruler tape measure etc measure from support to support covering track area where arrest took place Clamp one end of string to the concave face of track at the support Travel to the o...

Page 28: ...nut for wear Check that clamp plate lockwashers are compressed Check that black spring washer is not deformed and is in place Confirm spring pin is in place Check for smooth rolling action Recover Tro...

Reviews: