![GORBEL AL 1000 Installation, Operation & Maintenance Manual Download Page 23](http://html1.mh-extra.com/html/gorbel/al-1000/al-1000_installation-operation-and-maintenance-manual_2244884023.webp)
STEP 8 - FESTOONING INSTALLATION (CONTINUED)
Vacuum Hose Trolleys
Place strap around vacuum hose (by
others). Secure Velcro sides together
and be sure vacuum hose is held
snugly in place (
diagram 8F
).
Note:
Strap will fit vacuum hoses with outside
diameters ranging from 1-1/2” to 2-3/4”.
Clip vacuum hose hook (with vacuum
hose attached) onto vacuum hose
trolley (
diagram 8F
).
Note:
If Velcro strap does not hold vacuum
hose securely, engage vacuum device
so a vacuum is present in the hose and
retighten Velcro straps so the vacuum
hose is held tightly.
STEP 9 - FINAL STEPS
9.1
Check to make sure all bolts are tightened to specifications and lockwashers are flat.
9.2
Be sure to sway brace the crane, except when using flush mounted hangers.
9.3
If necessary, touch up crane with paint provided.
9.4
Install yellow rubber tracdoms on open ends of steel track.
9.5
Keep Packing List, Installation Manual, General Arrangement Drawing, and any other
inserts filed together in a safe place.
Diagram 8F.
Installing vacuum hose on vacuum hose trolley.
TIP:
Do not throw away this manual: the maintenance schedule is on the back cover.
Æ
21
9/05
Summary of Contents for AL 1000
Page 1: ......