25
User Manual V1.0-2022-08-20
06 Electrical Connection
GMK120
GMK120
Power Limit Network
The PV station generates power for self-consumption, but the electric equipment cannot
consume all the generated power. The inverter can monitor the on-grid electric data in real-time
and adjust the output power via a smart meter to avoid the residual current feeding back to the
utility grid.
6.5 Communication
6.5.1 Communication Network Introduction
Inverter
PV String
Utility Grid
Loads
Circuit
Breaker
Cir
cuit
Br
eaker
Meter
Notice
After completing cable connections, set related parameters via LCD or SolarGo app to enable
export power limit control or output power limit control.
Inverter
PV String
Utility Grid
Loads
Circuit
Breaker
Cir
cuit
Br
eaker
Meter
Networking under 240V Nominal Output Voltage
Networking under 208V Nominal Output Voltage