The gas piping supplying the furnace must be properly sized based
on the gas flow required, specific gravity of the gas, and length of
the run.  The gas line installation must comply with local codes, or
in their absence, with the latest edition of the National Fuel Gas
Code, NFPA 54/ANSI Z223.1.

To connect the furnace to the building’s gas piping, the installer
must supply a ground joint union, drip leg, manual shutoff valve,
and line and fittings to connect to gas valve.  In some cases, the
installer may also need to supply a transition piece from 1/2" pipe
to a larger pipe size.

The following stipulations apply when connecting gas piping.  Refer
to 

Gas Piping Connections 

figure for typical gas line connections to

the furnace.

• Gas piping must be supported external to the furnace cabinet

so that the weight of the gas line does not distort the burner
rack, manifold or gas valve.

Use black iron or steel pipe and fittings for building piping.
Where possible, use new pipe that is properly chamfered,
reamed, and free of burrs and chips.  If old pipe is used, be
sure it is clean and free of rust, scale, burrs, chips, and old pipe
joint compound.

Use pipe joint compound on male threads ONLY.  Always use pipe joint compound (pipe dope) that is APPROVED FOR ALL
GASSES.  DO NOT apply compound to the first two threads.

Use ground joint unions.

Install a drip leg to trap dirt and moisture before it can enter the gas valve.  The drip leg must be a minimum of three inches
long.

Install a 1/8" NPT pipe plug fitting, accessible for test gauge connection, immediately upstream of the gas supply connection
to the furnace.

Always use a back-up wrench when making the connection to the gas valve to keep it from turning.  The orientation of the gas
valve on the manifold must be maintained as shipped from the factory.  Maximum torque for the gas valve connection is 375
in-lbs; excessive over-tightening may damage the gas valve.

Install a manual shutoff valve between the gas meter and unit within six feet of the unit.  If a union is installed, the union must
be downstream of the manual shutoff valve, between the shutoff valve and the furnace.

Tighten all joints securely.

Connect the furnace to the building piping by one of the following methods:

Rigid metallic pipe and fittings.

Semi-rigid metallic tubing and metallic fittings.  Aluminum alloy tubing must not be used in exterior locations.  In order to
seal the grommet cabinet penetration, rigid pipe must be used to reach the outside of the cabinet.  A semi-rigid connector
to the gas piping may be used from there.

Use listed gas appliance connectors in accordance with their instructions.  Connectors must be fully in the same room as the
furnace.

Protect connectors and semirigid tubing against physical and thermal damage when installed.  Ensure aluminum-alloy tubing
and connectors are coated to protect against external corrosion when in contact with masonry, plaster, or insulation, or
subjected to repeated wetting by liquids such as water
(except rain water), detergents, or sewage.

T

O

 

AVOID

 

POSSIBLE

 

UNSATISFACTORY

 

OPERATION

 

OF

 

EQUIPMENT

 

DAMAGE

 

DUE

 

TO

 

UNDERFIRING

 

OR

 

EQUIPMENT

USE

 

THE

 

PROPER

 

SIZE

 

OF

 

NATURAL

/

PROPANE

 

GAS

 

PIPING

 

NEEDED

 

WHEN

 

RUNNING

 

PIPE

 

FROM

 

THE

 

METER

/

TANK

 

TO

 

THE

 

FURNACE

.

WARNING

Natural Gas  Capacity of Pipe

In Cubic Feet of Gas  Per Hour (CFH)

Length of

Nominal Black  Pipe Size

Pipe in Feet

1/2"

3/4"

1"

1 1/4"

1 1/2"

10

132

278

520

1050

1600

20

92

190

350

730

1100

30

73

152

285

590

980

40

63

130

245

500

760

50

56

115

215

440

670

60

50

105

195

400

610

70

46

96

180

370

560

80

43

90

170

350

530

90

40

84

160

320

490

100

38

79

150

305

460

(Pressure 0.5 psig or less and pressure drop of 0.3" W.C.; Based on
0.60 Specific Gravity Gas)

CFH =

BTUH Furnace Input   
Heating Value of Gas (BTU/Cubic Foot)

Summary of Contents for *CSS9*

Page 1: ...OF CONTENTS SAFETY CONSIDERATIONS 3 SHIPPING INSPECTION 4 ELECTROSTATIC DISCHARGE ESD PRECAUTIONS 4 TO THE INSTALLER 5 PRODUCT APPLICATION 5 LOCATION REQUIREMENTS CONSIDERATIONS 6 CLEARANCES AND ACCES...

Page 2: ...EASUREMENT NATURAL GAS ONLY 34 TEMPERATURE RISE 34 CIRCULATOR BLOWER SPEEDS 35 BLOWER HEAT OFF DELAY TIMINGS 35 NORMAL SEQUENCE OF OPERATION 35 POWER UP 35 HEATING MODE 35 COOLING MODE 36 FAN ONLY MOD...

Page 3: ...tion GOODMAN WILL NOT BE RESPONSIBLE FOR ANY INJURY OR PROPERTY DAMAGE ARISING FROM IMPROPER SERVICE OR SERVICE PROCEDURES IF YOU INSTALL OR PERFORM SERVICE ON THIS UNIT YOU ASSUME RESPONSIBILITY FOR...

Page 4: ...nente muerte DANGER PELIGRO POSSIBLE PROPERTY DAMAGE PERSONAL INJURY OR DEATH DUE TO FIRE EXPLOSION SMOKE SOOT CONDENSATION ELECTRICAL SHOCK OR CARBON MONOXIDE MAY RESULT FROM IMPROPER INSTALLATION RE...

Page 5: ...d appliance and is appropriate for use with natural or propane gas NOTE If using propane a propane conversion kit is required Dual certification means that the combustion air inlet pipe is optional an...

Page 6: ...urnace is heating Provide provisions for venting combustion products outdoors through a proper venting system Special consideration should begiventovent fluepiperoutingandcombustionairintakepipewhenap...

Page 7: ...lationoveracombustiblefloorbecomesnecessary useanaccessory subbase seeSpecificationSheetapplicableforyourmodelfordetails Aspecialaccessorysubbasemustbeusedforupright counterflow unit installations ove...

Page 8: ...any unused openings in the venting system 2 Inspect the venting system for proper size and horizontal pitch as required by the National Fuel Gas Code ANSI Z223 1 or the Natural Gas and Propane Install...

Page 9: ...back drafting or improper combustion of gas fired appliances thereby exposing building occupants to gas combustion products that could include carbon monoxide If this furnace is to be installed in th...

Page 10: ...cesidepanel suspendingitbelowthefurnace Aminimum clearance of 5 5 below the furnace must be provided for the drain trap Additionally the appropriate downward piping slope must be maintained from the d...

Page 11: ...all vent flue piping and connectorsarecompatiblewithfurnaceflueproducts Additionally itistheresponsibilityoftheinstallertoensurethatallpipingand connections possess adequate structural integrity and s...

Page 12: ...in a horizontal section of pipe as this may create a water trap PREFERRED TRANSITION NO LESS THAN 45 DEGREES TO HORIZONTAL PLANE TO AVOID CREATING A WATER TRAP IN VENT PIPING ACCEPTABLE NO TRANSITION...

Page 13: ...e responsibility of the installer to ensure that the piping connections to the furnace are secure airtight and adequately supported Vent FluePipe The vent pipe outlet is sized to accept 2 pipe Secure...

Page 14: ...AN RESULT IN LEAKS CAUSING BODILY INJURY OR DEATH DUE TO EXPOSURE TO FLUE GASES INCLUDING CARBON MONOXIDE WARNING ALTERNATE COMBUSTION AIR PROVISION Upflow Horizontal models only When using the altern...

Page 15: ...ollowing figure Refer to Vent Flue Pipe and Combustion Air Pipe To secure the pipe passing through the wall and pro hibit damage to piping connections a coupling should be in stalled on either side of...

Page 16: ...anufacturer s specifications to prevent separation and flue gas leaks Figure 11 COMBUSTION AIR INTAKE OPTIONAL Not required for single pipe installation TEE OPTIONAL 96 MAX 3 MIN ROOF LINE INTAKE SCRE...

Page 17: ...es used in the terminations must be included when de termining the number of elbows in the piping systems If the combustion air intake pipe is to be installed above a finished ceiling or other area wh...

Page 18: ...the Side Wall Vent Kit p n0170K00000S or 0170K000001S forinstallationspeci fications CONDENSATE DRAIN LINES DRAIN TRAP A condensing gas furnace achieves its high level of efficiency by extracting hea...

Page 19: ...he furnace trap GENERAL DRAIN INFORMATION All furnace models come with a factory installed drain trap For vertical installations the trap will remain in the factory position except for a counterflow w...

Page 20: ...re with 1 clamp 5 Refer to Field Supplied Drain section for instructions on field supplied installed drain on outlet of furnace trap UPFLOW MODEL INSTALLED HORIZONTALLY WITH RIGHT SIDE DOWN Minimum 5...

Page 21: ...11 Draining the Collector Box Install the non grommet end of hose 11 from outside the cabinet in the bottom drain hole Install on collector box and secure with a silver clamp 12 Use two silver clamps...

Page 22: ...rap 3 Draining the Collector Box From outside the cabinet insert the non grommet end hose 8 into the back drain hole 4 Secure to collector box drain port using a silver clamp 5 Draining the Vent Elbow...

Page 23: ...NEC Class 1 and must comply with all applicable codes The furnace must be electrically grounded in accordance with local codes or in their absence with the latest edition ofThe National Electric Code...

Page 24: ...ctrical panel NOTE Do not use gas piping as an electrical ground To confirm proper unit grounding turn off the electrical power and perform the following check 1 Measure resistance between the neutral...

Page 25: ...areas the gas supplier may artificially derate the gas in an effort to compensate for the effects of altitude If the gas is artificially derated the appropriate orifice size must be determined based...

Page 26: ...ld must be maintained as shipped from the factory Maximum torque for the gas valve connection is 375 in lbs excessive over tightening may damage the gas valve Install a manual shutoff valve between th...

Page 27: ...lug in Alternate Gas Line Hole Gas Valve Burners Manual Shut Off Valve upstream from ground joint pipe union Drip Leg Grommet in Standard Gas Line Hole Ground Joint Pipe Union Ground Joint Pipe Union...

Page 28: ...oldwithallgasappliancesinoperation Main taining proper gas pressure depends on three main factors 1 Vaporization rate depending on temperature of the liquid and wetted surface area of the container or...

Page 29: ...ws 1 With clean filters in the furnace use a draft gauge inclined manometer to measure the static pressure of the return duct at the inlet of the furnace Negative Pressure 2 Measure the static pressur...

Page 30: ...o avoid condensation in the heating element With a parallelflowarrangement thedampersorothermeansusedtocontrol the flow of air must be adequate to prevent chilled air from entering the furnace and if...

Page 31: ...ter Locations Figure 37 Based on 300 ft min filter face velocity Change filters before occupants take ownership of a new home Model Minimum Filter Size MSS960402BNA 14 X 30 MSS960603BNA 20 X 25 MSS960...

Page 32: ...n smell for gas Be sure check near the floor as some types of gas are heavier than air 7 If you smell gas after five minutes immediately follow the Safety Instructions on page 3 of this manual If you...

Page 33: ...made by adjusting the gas valve pressure regulator The manifold pressure must be measured with the burners operating To measure and adjust the manifold pressure use the following proce dure 1 Turn OFF...

Page 34: ...ells us that at this rate it would take 46 seconds to consume one cu ft of gas 3600 46 78 This tells us that in one hour the furnace would consume 78 cu ft of gas The typical value range for 1 cu ft o...

Page 35: ...l terminals 4 Connect all unused blower motor leads to the PARK terminals on the integrated control module Any leads not connected to the PARK terminals must be taped 5 Turn ON power to furnace 6 Veri...

Page 36: ...an and compressor are de energized Circulator blower continues running during a cool off delay period of 45 seconds Furnace awaits next call from thermostat FAN ONLY MODE The normal operational sequen...

Page 37: ...ungrounded furnaces 1 Disconnectallpowertothefurnace Donottouchtheintegratedcontrolmoduleoranywireconnectedtothecontrolprior to discharging your body s electrostatic charge to ground 2 Firmly touch a...

Page 38: ...ipesystem Checkforblockageand orleakage Check theoutsideterminationandtheconnectionsatandinternal to the furnace Heat exchanger Check for corrosion and or buildup within the heat exchanger passageways...

Page 39: ...e burners without curling floating or lifting off Flames must not impinge on the sides of the heat exchanger firing tubes INDUCED DRAFT AND CIRCULATOR BLOWERS The bearings in the induced draft blower...

Page 40: ...e ordered by description Parts are available from your distributor Functional Parts List Gas Valve BlowerMotor Gas Manifold BlowerWheel Natural Gas Orifice BlowerMountingBracket Propane Gas Orifice Bl...

Page 41: ...Loose or improperly connected wiring Pressure switch circuit not closed Induced draft blower is operat ing Induced draft blower runs continuously with no further furnace operation Integrated control m...

Page 42: ...ir Induced draft blower and circulation blower runs continuously No furnace operation Integrated control module diagnostic LED is flashing FIVE 5 flashes Flame sensed with no call for heat Correct sho...

Page 43: ...5 1084 1005 HIGH 5 0 2284 30 2231 31 2170 31 2103 32 2037 33 1945 1836 1750 MED 4 0 1865 37 1869 36 1775 38 1732 39 1684 40 1619 1548 1480 MED LO 3 5 1594 43 1571 43 1530 45 1492 46 1454 47 1414 1355...

Page 44: ...N A 610 N A 604 571 519 HIGH 5 0 2233 32 2159 33 2086 34 2024 35 1941 37 1850 1753 1651 MED 4 0 1820 39 1778 40 1742 41 1695 42 1638 43 1551 1485 1384 MED LO 3 5 1571 45 1535 46 1497 48 1446 49 1402...

Page 45: ...45 THIS PAGE LEFT INTENTIONALLY BLANK...

Page 46: ...servicing or installing this unit Multiple power sources may be present Failure to do so may cause property damage personal injury or death Wiring is subject to change Always refer to the wiring diag...

Page 47: ...gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OBSTRUCTIONS 4 INSPECTION The state or loc...

Page 48: ...n on Products Parts Warranties Contractor Programs and Training Customer Services Financing Options 5151 San Felipe Suite 500 Houston TX 77056 www goodmanmfg com www amana hac com 2014 Goodman Manufac...

Reviews: