Curb installations must comply with local codes and should follow the established 
guidelines of the National Roofing Contractors Association.
Proper unit installation requires that the roof curb be firmly and permanently 
attached to the roof structure. Check for adequate fastening method prior to 
setting the unit on the curb.
Full  perimeter  roof  curbs  are  available  from  the  factory  and  are  shipped 
unassembled.  The  installing  contractor  is  responsible  for  field  assembly, 
squaring, leveling, and mounting on the roof structure. All required hardware 
necessary  for  the  assembly  of  the  sheet  metal  curb  is  included  in  the  curb 
accessory package.
•  Determine  sufficient  structural  support  before  locating  and  mounting  the 

curb and package unit.

•  Duct-work  must  be  constructed  using  industry  guidelines.  The  duct-work 

must be placed into the roof curb before mounting the package unit. Our full 
perimeter curbs include duct connection frames to be assembled with the 
curb. Cantilevered-type curbs are not available from the factory.

•  Contractor furnishes curb insulation, cant strips, flash

-

ing, and general roofing material.

•  Support curbs on parallel sides with roof members. To 

prevent damage to the unit, the roof members can

-

not penetrate supply and return duct openings.

Note:

 The unit and curb accessories are designed to allow 

vertical  duct  installation  before  unit  placement.  Duct 
installation after unit placement is not recommended.
See the manual shipped with the roof curb for assembly 
and installation instructions.

t

oP

 V

ieW

3-d V

ieW

15 x 31⅛

Supply Opening

14⅝ x 38

Return Opening

92¼

53¼

14

1⅝

¾

14

1⅜

P

oWer

 

and

 l

oW

-V

oltage

 B

loCk

 l

oCationS

Power Wiring

Thermostat

 

Wiring

Summary of Contents for CPH COMMERCIAL SS-CPH90-150

Page 1: ...utility entry AHRI Certified ETL Listed Cabinet Features Heavy gauge galvanized steel cabinet with UV resistant powder paint finish Full Perimeter Rail Curb Fit CPH Commercial up to 11 5 EER up to 3 5...

Page 2: ...ns 400 400 000 BTU h 025 25 kW 075 75 kW X No Op ons A Down ow Economizer Voltage Supply Fan Drive Type Motors 1 208V 1 Phase 4 460V 3 Phase B Belt Drive 2 220 240V 1 Phase 50 Hz 5 380 415V 3 Phase 50...

Page 3: ...or Sheave Blower Sheave VL40 AK74 VL40 AK74 VL40 AK74 Belt AX51 AX51 AX51 Condenser Fan Coil Quantity of Condenser Fan Motors 2 2 2 Horsepower RPM 1090 890 1075 Fan Diameter Fan Blades 22 4 22 4 22 4...

Page 4: ...15 x 12 Motor Sheave Blower Sheave VL40 AK74 VL40 AK74 VL40 AK74 Belt AX51 AX51 AX51 Condenser Fan Coil Quantity of Condenser Fan Motors 2 2 2 Horsepower RPM 1 4 1 090 1 4 890 1 4 1 075 Fan Diameter...

Page 5: ...15 x 15 1 15 x 15 Motor Sheave Blower Sheave VL40 AK74 VL40 AK74 VL40 AK74 Belt AX51 AX51 AX51 Condenser Fan Coil Quantity of Condenser Fan Motors 2 2 2 Horsepower RPM 1 075 1 075 1 125 Fan Diameter F...

Page 6: ...er Sheave VL40 AK66 VL40 AK66 VL40 AK66 Condenser Fan Coil Quantity of condenser Fan Motors 2 2 2 Horsepower RPM 1 075 1 075 1 075 Fan Diameter Fan Blades 22 3 22 3 22 3 Outdoor Nominal CFM 7 200 7 20...

Page 7: ...99 91 81 73 65 57 53 51 43 37 32 28 22 CPH120 Outdoor Ambient Temperature 65 60 55 50 47 45 40 35 30 25 20 17 15 10 5 0 5 10 MBh 150 8 142 8 134 4 125 6 120 0 116 3 108 0 99 6 87 7 81 0 74 6 70 4 67 8...

Page 8: ...0 77 0 58 0 38 0 89 0 79 0 60 0 39 0 91 0 82 0 62 0 40 0 95 0 85 0 64 0 41 0 96 0 86 0 65 0 42 T 20 19 15 11 21 19 16 11 21 19 16 11 21 19 16 11 20 19 15 11 19 18 14 10 kW 6 24 6 36 6 55 6 75 6 69 6 8...

Page 9: ...4 414 445 470 490 Lo PR 106 113 123 131 112 119 130 139 116 124 135 144 122 130 142 151 128 136 149 159 133 141 154 164 85 3375 MBh 92 9 94 7 99 2 105 8 90 7 92 5 96 8 103 3 88 6 90 3 94 5 100 9 86 4...

Page 10: ...0 86 0 77 0 58 0 37 0 88 0 79 0 59 0 38 0 91 0 81 0 61 0 39 0 94 0 84 0 64 0 41 0 95 0 85 0 64 0 41 T 20 19 15 11 20 19 15 11 20 19 15 11 21 19 16 11 20 19 15 11 19 17 14 10 kW 7 24 7 38 7 59 7 81 7 7...

Page 11: ...1 421 453 478 499 LO PR 104 111 121 128 110 117 127 136 114 121 132 141 120 127 139 148 126 134 146 155 130 138 151 161 85 3820 MBh 105 3 107 3 112 4 119 9 102 8 104 8 109 8 117 1 100 4 102 3 107 1 11...

Page 12: ...1 109 4 112 6 121 9 130 8 103 9 107 0 115 8 124 3 96 3 99 1 107 3 115 1 S T 0 84 0 76 0 57 0 37 0 88 0 78 0 59 0 38 0 90 0 80 0 61 0 39 0 93 0 83 0 63 0 40 0 96 0 86 0 65 0 42 0 97 0 87 0 66 0 42 T 20...

Page 13: ...7 435 468 494 516 Lo Pr 105 112 122 130 111 118 129 137 115 123 134 143 121 129 141 150 127 135 147 157 131 140 152 162 85 4500 MBh 121 8 124 1 130 0 138 7 118 9 121 2 127 0 135 5 116 1 118 4 124 0 13...

Page 14: ...0 56 0 36 0 85 0 76 0 57 0 37 0 88 0 78 0 59 0 38 0 91 0 81 0 62 0 40 0 92 0 82 0 62 0 40 T 23 21 17 12 23 21 17 12 23 21 17 12 23 21 17 12 23 21 17 12 21 20 16 11 kW 10 55 10 77 11 11 11 46 11 36 11...

Page 15: ...0 497 518 LO PR 98 105 114 122 104 111 121 129 108 115 126 134 114 121 132 140 119 127 138 147 123 131 143 152 85 4725 MBh 150 7 153 6 160 9 171 6 147 2 150 0 157 1 167 6 143 7 146 4 153 4 163 6 140 2...

Page 16: ...ndard Belt Drive Horizontal ESP In H2 O Turns Open 0 1 2 3 4 5 CFM RPM BHP CFM RPM BHP CFM RPM BHP CFM RPM BHP CFM RPM BHP CFM RPM BHP 0 1 3625 701 1 08 3309 660 0 86 0 3 3815 797 1 44 3468 747 1 11 3...

Page 17: ...Belt Drive Horizontal ESP In H2 O Turns Open 0 1 2 3 4 5 CFM RPM BHP CFM RPM BHP CFM RPM BHP CFM RPM BHP CFM RPM BHP CFM RPM BHP 0 1 3475 698 1 05 3159 657 0 83 0 3 3665 794 1 41 3318 744 1 08 3027 7...

Page 18: ...367 995 2 41 3845 954 1 91 1 4 4550 1064 2 83 4290 1042 2 56 3913 1006 2 13 1 6 4327 1087 2 73 3990 1057 2 37 1 8 4652 1148 3 33 4023 1105 2 58 2 4306 1162 3 05 Standard Belt Drive Horizontal ESP In H...

Page 19: ...izontal ESP in W C Turns Open 0 1 2 3 4 5 CFM BHP CFM BHP CFM BHP CFM BHP CFM BHP CFM BHP 0 2 5570 2 27 4935 1 70 4584 1 36 0 4 5871 3 20 5639 2 77 5307 2 31 4902 1 88 4637 1 55 4178 1 19 0 6 5610 3 0...

Page 20: ...4 16 42 45 15 3000 3375 CFM EHK4 30 64 70 30 3000 3375 CFM EHK4 45 84 90 43 3000 3375 CFM Model and Heat Kit Usage MCA at 208 240V MOP amps at 208 240V Actual kW at 240V Recommended Airflow Range CPH0...

Page 21: ...amps at 575V Actual kW at 575V Recommended Airflow Range Downshot Recommended Airflow Range Horizontal CPH102 7B 17 20 EHK7 16 36 40 15 3400 3825 CFM 3400 3825 CFM EHK7 30 55 60 30 3400 3825 CFM 3400...

Page 22: ...MOP amps at 208 240V Actual kW at 240V Recommended Airflow Range CPH120 3B 49 60 EHK3 16 81 94 90 100 15 3500 4500 CFM EHK3 30 122 139 125 150 35 3500 4500 CFM EHK3 45 154 178 175 200 43 4000 4500 CF...

Page 23: ...Model and Heat Kit Usage MCA at 208 240V MOP amps at 208 240V Actual kW at 240V Recommended Airflow Range CPH150 3B 65 80 EHK3 16 110 110 15 4000 5600 EHK3 30 155 175 30 4300 5600 EHK3 45 194 200 43...

Page 24: ...TURN SUPPLY 5 3 8 7 1 2 6 1 2 99 1 8 61 3 4 Y NOTE For horizontal discharge remove the supply and return duct covers and place them over the vertical discharge return and supply openings Install with...

Page 25: ...proper unit operation Leave a total clearance of 75 on the main control panel side of the unit for possible removal of fan shaft coil electric heat and gas furnace Leave a clearance of 48 on all other...

Page 26: ...ior to installing the unit Duct work dimensions are shown in Roof Curb Installation Instructions Manual Refer to the Roof Curb Installation Instructions for proper curb installation Curbing must be in...

Page 27: ...ocating and mounting the curb and package unit Duct work must be constructed using industry guidelines The duct work must be placed into the roof curb before mounting the package unit Our full perimet...

Page 28: ...mbers 0907 and below Wiring is subject to change Always refer to the wiring diagram or the unit for the most up to date wiring Warning High Voltage Disconnect all power before servicing or installing...

Page 29: ...numbers 0907 and below Wiring is subject to change Always refer to the wiring diagram or the unit for the most up to date wiring Warning High Voltage Disconnect all power before servicing or installin...

Page 30: ...YL RD T1 T3 T2 COMP2 WH BL BL BL BK T1 T3 T2 C RD EM BK OR BL BK 2 0 8 2 4 0 4 6 0 5 7 5 3 6 0 BK BC BK F RCCF2 C BK BL BR RD PU CMC T1 T2 L1 L2 OR C F 3 2 1 9 6 8 7 4 5 WH YL PU WH BL BL Y Y2 WH GR...

Page 31: ...LE PLUG AND ATTACH FEMALE PLUG TO THE ECONOMIZER ACCESSORY 4 FOR TWO STAGE OPERATION REMOVE W1 TO W2 JUMPER WIRE EBTDR CC1 DC EBTDR TB1 HPS1 LPS1 LOW VOLTAGE LINE VOLTAGE FIELD WIRING LOW VOLTAGE OPTI...

Page 32: ...BK T1 T3 T2 C RD EM BK OR BL BK 2 0 8 2 4 0 4 6 0 5 7 5 3 6 0 BK BC BK F RCCF2 C BK BL BR RD PU CMC T1 T2 L1 L2 OR C F 3 2 1 9 6 8 7 4 5 WH YL PU WH BL BL Y Y2 WH GR PU YL OR TB1 RD BR H T O R W2 T Y1...

Page 33: ...PLUG AND ATTACH FEMALE PLUG TO THE ECONOMIZER ACCESSORY 4 FOR TWO STAGE OPERATION REMOVE W1 TO W2 JUMPER WIRE EBTDR CC1 DC EBTDR TB1 HPS1 LPS1 LOW VOLTAGE LINE VOLTAGE FIELD WIRING LOW VOLTAGE OPTION...

Page 34: ...0 Downflow Economizer 7 10 tons DNECONHP150 Downflow Economizer 12 tons DNSQRRND90 Downflow Square to Round Adapter 20 Round 7 tons Electric Heat Kits HSKT090 High Static Kit for 7 ton CPH AA 8 ton CP...

Page 35: ...Product Specifications SS CPH90 150 www goodmanmfg com 35 Notes...

Page 36: ...H90 150 Goodman Manufacturing Company L P reserves the right to discontinue or change at any time specifications or designs without notice or without incurring obligations 2010 Goodman Manufacturing C...

Reviews: