Caramatic TwoControl
21 / 84
Artikel-Nr. 02 493 50
b
•
Place the transmitter
connection
straight on the visual indicator.
•
Then guide the transmitter connection cable
out
of the gas locker and connect it to the
connection cable
outside
.
Installation of the Eis-Ex regulator heating
Malfunction owing to dirt in the blind hole!
Proper functioning is not guaranteed.
Visually check that there are no metal chips or other residues!
It is important that metal chips or other residues are carefully blown out!
Hot surface
Touching the regulator heating can result in burns.
During operation, the heating cartridge in the regulator heating heats to approx. 80°C.
Only switch the regulator heating on once it is correctly installed in the blind hole of
the pressure regulator.
•
Check the blind hole, remove any dirt.
•
Insert the heating cartridge for the Eis-Ex
regulator heating
into the blind hole and
attach with the screw included.
•
Then guide the Eis-Ex regulator heating
connection cable
out
of the gas locker
and connect it to the connection cable
outside
.