Double
‐
stage tank regulator PS 25 bar
8 / 16
4. Open the cylinder valve.
5. Press the start-up button of the excess flow valve (EFV).
6. Check the connections on the gas cylinder and on the emergency supply for leaks (spray
with a foaming agent according to EN 14291 (e.g. leak detector spray,
Part no. 02 601 00).
When the gas tank has been refilled, dismantle the emergency supply set in the
following sequence:
•
close the cylinder valve
•
loosen and remove the connections of the emergency supply set
•
screw the sealing nut of the emergency supply connector on again tightly (Figure 2),
•
check for leaks
CONNECTIONS
Inlet,
optional
Trading name and dimensions
acc. to standard
Installation notes
Cylindrical female thread
•
G.37 =
F
G 1/4, G 3/8, G 1/2, G 3/4 or G 1
•
For a screw-in connector with O-ring
Italian connection
•
with rubber gasket and cap nut
•
G.1
= Thread W 20 x 1/14 ÜM
Spanner size 25
Hexagonal
Large cylinder connection GF
•
with aluminium gasket
•
G.4
= Thread W 21.8 x 1/14 lh
Spanner size 30
Hexagonal
Combinded fitting (Komb.A)
•
with polyamide gasket
•
G.5
= Thread W 21.8 x 1/14
Spanner size 30
Hexagonal
4.
open
5.