Pa G e 4
i n s t R u c t i o n m a n ua l R c u 9 2 0 0 s e R i e s
InsTAllATIOn.
MOUnTIng.
the Rcu9200 is designed to be
panel mounted . the mounting
assembly supports mounting into
panels of up to 10 mm thick .
Before mounting, the Rcu9200
requires a hole of 76 mm to be cut
in the panel .
using the supplied template
(page 11) mark the location of the
hole to be cut . make sure there is
at least 60 mm of clearance behind
the panel to allow for the depth
of the remote unit and its cables .
there should also be at least
another 10 mm clearance around
the hole for the front panel facia
and the u-Bracket mounting clamp .
cut the 76 mm hole using a hole
saw or similar .
mount the Rcu9200 through
the hole from the front of the
panel . ensure the rubber gasket
is between the front facia and the
mounting surface .
Remove the two top nuts from the
two bolts on the rear of the unit .
Do not remove the two bottom
nuts as these are required to hold
the bolts in place .
slide the u-Bracket over the bolts
ensuring the clearance slots in the
bracket are positioned as shown .
slide the bracket forward until
it presses against the rear of the
mounting surface .
Refit the two nuts and tighten .
Do not over tighten otherwise
damage to the rear of the
Rcu9200 case may occur .
WIRIng
connect the attached fly lead to
one of the two in-line connectors
at the rear of the GR9200 if
required the cable can be extended
using one or more optional le024
5 meter extension leads (up to a
maximum of 15 meters) .
the single terminal pin on the rear
of the case is used to activate the
back lighting for the Rcu9200
display and keypad . connect this
to a +12 V Dc source using an
insulated spade connector (to
prevent the terminal shorting
to the u-Bracket) . connecting