background image

 

Figure 1 System Overview Diagram 

 

System Specification 

Table 2 is the brief spec of the GHESS 5.0_6.0kWh solar battery hybrid energy storage system.   
 

MODEL   

GHESS 5.0_6.0kWh 

System parameters

 

 

Nominal/useable capacity[kWh] 

6.0/4.80@80%DoD 

Installation 

All-in-one cabinet 

Warranty [year] 

5 years standard, battery 10 years extendable 

PV side input   

 

Max. input power [kW] 

5.0 

MPPT voltage range[V] 

280-800 

MPPT tracker 

Battery side input 

 

Operating voltage range[V] 

150@[120, 500] 

Max. charging power[kW] 

4.0 

Max. charging current [A] 

18 

Charging/discharging efficiency 

96.5%/96.5% 

AC output-on grid 

 

Max. output power[kW] 

5.0 

Output voltage range[V] 

3N~400, 324-436, 437-460(<10min.) 

Certification 

VDE-AR-N4105, IEC62109 

AC output-off grid (Optional) 

 

Rated voltage & frequency [V/Hz] 

400±2%,50±2% 

Output power [kW] 

Rated power 2.5, instantaneous power 5.0 

Power factor 

[-0.7, +0.7] 

Battery packs 

The lithium iron phosphate battery pack 

Nominal capacity [kWh] 

6.0 

Public Grid

M

Utility Meter

(Existed)

Meter

Load

Emergency 

Load

 

PV

Meter

AC GRID

AC LOAD

Summary of Contents for GHESS 5.0_6.0KWH

Page 1: ...GHESS 5 0_6 0KWH GMDE 3 Phase Solar Battery Hybrid Storage System Installation and Application Guide Version 1 0...

Page 2: ...n 7 3 Installation 7 3 1 Install the inverter 7 3 2 Install the battery packs 8 3 3 External Line Connection 11 4 System Operation 13 4 1 System Start Up 13 4 2 System Interface 13 4 2 1 Main Operatio...

Page 3: ...Manual 1 PCS Table 1 Packaging List 2 System Overview This manual describes the installation and operation of the GHESS series solar battery hybrid energy storage system HESS The GHESS series hybrid...

Page 4: ...cker 1 Battery side input Operating voltage range V 150 120 500 Max charging power kW 4 0 Max charging current A 18 Charging discharging efficiency 96 5 96 5 AC output on grid Max output power kW 5 0...

Page 5: ...5 0_6 0kWh system specification 2 1 Main System Components Viewing from outside you ll see the system is consisted of the main parts below Figure 2 Main System Components Illustration 1 Energy Manage...

Page 6: ...hing box To switch the system from grid tied to off grid operation mode when grid failure happens Energy Management System To monitor and control the system operation Battery packs including Battery C...

Page 7: ...erter into the system cabinet according to the following steps in Section 3 2 Install the battery packs and Section 3 1 Install the inverter finish the output line connection according to Section 3 3...

Page 8: ...d inverter 3 Slowly lower the hybrid inverter ensure the device hang on the hook of wall bracket 4 Check if the hybrid inverter is properly fixed on the wall Figure 5 Inverter installation 3 2 Install...

Page 9: ...d inverter Battery Control Box and battery modules with the lines as shown in Figure 7 the detailed DC line connection between inverter and battery packs are illustrated in Figure 8 The battery packs...

Page 10: ...Figure 7 Battery line connection...

Page 11: ...led DC line connection on battery side 3 3 External Line Connection Connecting the PV panels public grid AC load and meter with the systems with this system via the following output connectors as show...

Page 12: ...ernal Line Connection PowerVortex 305 Hybrid Inverter GMDE On Off Grid Auto Switching Box Energy Management System BAT BAT PV PV RS485 CAN COM RS485 PV Meter AC GRID AC LOAD L1 L2 L3 N L1 L2 L3 N PE P...

Page 13: ...Below is introduction on the 3 operation models 1 When the grid is normal 1 Self use mode the GHESS series solar battery hybrid system can increase the PV Self use up to 75 Daytime If there is enough...

Page 14: ...emergency load power is supplied by the system independently Auto switch to off grid it has device has integrated backup function So when the device sensors the drop change of the grid voltage it dis...

Page 15: ...on the touch screen to shift between different items 4 2 2 Change Operation Modes To change the system operation mode from default Self Use to Peak shaving please follow below steps 1 Touch the User i...

Page 16: ...en input the password to login The default password is 666666 Figure 12 Input the password 3 On the Setup page below User page touch the System button on the left side and change the System Mode optio...

Page 17: ...mode Figure 14 Time range and power setting under Peak Shaving mode 4 3 System Turn off To turn off 5 Turn off circuit breaker BAT QF12 6 Turn off circuit breaker PV QF11 7 Turn off the circuit break...

Page 18: ...tem and if not released contact your seller for service support 7 GFCI Device Warning Re start the system and if not released contact your seller for service support 8 Zpv PE Warning Re start the syst...

Page 19: ...rvice support 27 FanLock Warning Re start the system and if not released contact your seller for service support 28 EEPROM Warning Re start the system and if not released contact your seller for servi...

Page 20: ...he fault has been eliminated To acknowledge the fault messages press the ESC key or turn the GMDE inverter off with the DC switch Wait for a while and turn the device on again 5 3 Technical Service GM...

Reviews: