Figure 6 Battery installation
2) At the back side of the cabinet, connect the hybrid inverter, Battery Control Box and battery
modules with the lines as shown in Figure 7; the detailed DC line connection between inverter
and battery packs are illustrated in Figure 8. (The battery packs are connected in parallel, which
means the final battery pack equals to 150V/40Ah)