LEDTASKtapeINST
PAGE 6 OF 10
Test Before Permanently
Mounting
After confirming that your LTR-P-WP pre-configured
order is accurate, lay everything out and connect
per these instructions.
Fig. 1.
Test tape installation by powering up before
permanently mounting. If tape does
perform satisfactorily, check our FAQ / Trou-
bleshooting tips on page 7.
Mounting With 3M Adhesive
Tape
Your LTR-P-WP configured layout came with enough
3M double stick tape to adhere your complete
configured application to the surface.
Peel back paper covering to expose adhesive and then
carefully press ribbon into place.
Fig. 2.
Using Mounting Channels
See ‘Using Mounting Channels’ instructions on
Page 4. Drill mounting holes using counter-sunk
screws (by others).
Fig. 3.
. Lay in tape with using
3M double stick tape to insure that tape is securely
in position within channel. Attach frosted lens.
Connectors do not fit in all channels.
Using Silicone Mounting Clips
Using the supplied tube of silicone gel, squeeze gel
into end cap and push onto end of run, capping off
the final length of tape.
Fig. 4.
LEDTask™ Flexible LED Tape
LTR-P WP Series
Wet Location LED Tape
Terminating Run with End Cap
Using the supplied tube of silicone gel, squeeze gel
into end cap and push onto end of run, capping off the
final length of tape.
Fig. 5.
Fig. 1
Fig. 2
Fig. 3
Fig. 4
Silicone sealant
(supplied with wet location
tape)
End cap
Fig. 5