Glow-worm Micron 100FF Instructions For Use Manual Download Page 32

32

221954D

13.1 Part Identification

The key number in the diagram and the first column of the list will help to identify the spare part.

13.2  Ordering

When ordering any spare part, please quote the part number and the description from the list together with the model name and serial
number information from the data label.  The data label is positioned at the bottom right hand side of case.

If ordering from British Gas also quote the GC number of the appliance from the data label and the GC number of the spare part, from
the list.

 Ref

Part No

Description

Location

GC Part No

13 Spare Parts

Because of our constant endeavour for improvement, details may vary slightly from those shown in these instructions.

1

800442

Multifunctional control

Diagram 12.3

278 021

2

08040

“O” ring

Diagram 12.3

334 592

3

205727

Injector - 100FF

Diagram 10.6

278 197

3a

205726

Injector - 120FF

Diagram 10.6

278 196

4

203432

Pilot burner - 100FF

Diagram 10.7

278 023

4a

203434

Pilot burner - 120FF

Diagram 10.7

E00 998

5

2000801236

Mica Window and Gasket

Diagram 12.5

6

2000800529

Fan assembly - 100FF

Diagram 5.3

278 194

6a

2000800532

Fan assembly - 120FF

Diagram 5.3

278 185

7

202626

Spark electrode and lead - 100FF

Diagram 10.7

313 998

7a

202629

Spark electrode and lead - 120FF

Diagram 10.7

278 238

8

K3580

Clip - electrode

Diagram 10.7

390 983

9

800850

Thermostat - control

Diagram 12.1

*** ***

10

202232

Air pressure switch - 100FF

Diagram 12.6

278 239

10a

202201

Air pressure switch - 120FF

Diagram 12.6

313 992

11

800275

Control knob

Diagram 12.1

313 609

12

2000800656

Water pressure switch

Diagram 12.7

*** ***

13

204212

“O” ring

Diagram 12.7

281 343

14

202015

Fuse

Diagram 11.5

334 750

15

900847

Control board PCB  (not illustrated)

Diagram 12.2A

*** ***

16

800272

Overheat safety cutoff

Diagram 12.2A

313 606

1

2

3 & 3a

4

7 & 7a

8

9

10 &10a

11

12

13

4a

5

6 & 6a

16

14

12524

Summary of Contents for Micron 100FF

Page 1: ...e f t w i t h t h e u s e r 4272 Instructions for Use Installation and Servicing G C No 41 047 52 G C No 41 047 23 REGISTER YOUR GLOW WORM APPLIANCE FOR 1ST YEAR GUARANTEE PROTECTION CALL 0800 073 21...

Page 2: ...ified by Notified body 0086 The CE mark on this appliance shows compliance with 1 Directive 90 396 EEC on the approximation of the laws of the Member States relating to appliances burning gaseous fuel...

Page 3: ...nstallation and Use Regulations Section 35 It is the law that any servicing is carried out by a competent person To obtain service please call your installer or Glow worm s own Service Organisation us...

Page 4: ...hes off and the main burner lights The flames can be seen through the viewing window see diagram 8 2 The main burner will remain alight until switched off by the control thermostat or any remote contr...

Page 5: ...ion CheSS and 2 GPG 302 2001 Controls for domestic central heating system and hot water BRECSU 1 2 Data See Table 1 All dimensions are given in millimetres except as noted The Seasonal Efficiency Dome...

Page 6: ...132 5 835 772 63 132 43 78 5 1 11 Location This boiler is not suitable for outdoor installation The boiler may be installed in any room although particular attention is drawn to the requirements of BS...

Page 7: ...allow for easy removal of the boiler 1 General FRONT VIEW 6mm 6mm 6mm 160mm 500mm From a permanent surface ADDITIONAL CLEARANCES MAY BE REQUIRED FOR INSTALLATION 6mm 6mm 65mm Diagram 1 3 DATA LABEL Wh...

Page 8: ...eral NOTE Lift weight is with Flue Elbow Controls Cover and Front Cover removed DATA TABLE 1 MODEL TOTAL DRY WEIGHT Including Terminal LIFT WEIGHT WATER CONTENT GAS CONNECTION ELECTRICITY RATING WATER...

Page 9: ...of 50mm clearance from any part of the terminal and be central over the terminal see diagram 2 2 A suitable guard reference Type K3 can be obtained from Tower Flue Components Ltd Morley Road Tonbridge...

Page 10: ...pump to operate onbypassonly thebypassconnectionmustbeatleast2 5metres away from the boiler The flow through the boiler must not be allowed to fall such that thereisatemperaturedifferencegreaterthan2...

Page 11: ...of BS5449 and BS7074 Part 1 for IE refer to the current edition of I S 813 Domestic Gas Installations The charge pressure must not be less than the static head of the system that is the height of the...

Page 12: ...sition before starting Refer to diagram 4 1 or 4 2 NOTE If a longer flue duct is required DO NOT extend the telescopic flue beyond its maximum length A 1 2 or 3metre flue system and terminal MUST be u...

Page 13: ...e from the outside wall face to the boiler centre line Check that the flue length will be suitable see diagram 4 3 Extend the standard telescopic flue to the required length making sure that the minim...

Page 14: ...4 5 then cut to length cutting square and removing any burrs NOTE Owing to its variable length the standard telescopic flue may not need cutting 4 10 Flue Assembly Locate the flue duct drilled end on...

Page 15: ...3 CLEAR RED FLUE HOOD SECURING SCREW 4 FAN SECURING SCREWS FAN ASSEMBLY AIR PRESSURE SENSING PIPES CLEAR ELECTRICAL CONNECTIONS 4287 Diagram 5 5 Diagram 5 4 FLUE HOOD SECURING SCREWS 4 FAN SECURING BR...

Page 16: ...int screws see diagram 6 2 Make sure of the correct fitting of the flue to the boiler Pull the flue duct forwards and engage onto the flue elbow Push the air duct back into the wall to the dimension s...

Page 17: ...ed NOTE Open Vented Water Systems ONLY Bridge terminals K1 and K2 7 3 Pump Connection The pump must be connected directly to the control box as shown in diagram 7 2 threading the cable through the cab...

Page 18: ...k must be carried out by a competent person in accordance with the current issue of BS6798 Make sure that all naked lights and cigarettes are out Identify the controls by reference to diagram 8 1 Chec...

Page 19: ...tat or a remote system control To make sure that the flame supervision device is working correctly the following should be done 1 With the main burner alight turn the gas service cock Off see diagram...

Page 20: ...er should be turned off and the system drained off as rapidly as possible whilst still hot 8 7 Adjustment Fully Pumped Open Vented and Sealed Water Systems When commissioning the system the boiler sho...

Page 21: ...thermostat calibration screw Operate the boiler again on full service and check that the balancing is satisfactory making adjustments as necessary Fit the front cover by hooking it under at the top an...

Page 22: ...ng turn off the gas and isolate the electrical supply to the boiler After completing a service always test for gas soundness and carry out functional check on controls Unless stated otherwise all part...

Page 23: ...d when refitting to make sure a gas tight seal is made NOTE On refitting and after cleaning the heat exchanger make sure the burner is fitted correctly that is located on the main injector and horizon...

Page 24: ...PCB fuse Ignition pilot or flame proving fault see detailed fault finding chart Air flow proving fault that is fan or air pressure switch see detailed fault finding chart Multi functional control har...

Page 25: ...control thermostat to its maximum setting Also check fuses Check overheat reset If satisfactory replace overheat device Is neon 2 lit NO Is there 230V between K1 and N YES YES Check 0 2 Bar of water p...

Page 26: ...stop after several minutes YES Does the pump run when SL is applied Does pump continue to run after SL is interrupted NO NO System satisfactory YES The PCB has a pump overrun facility The pump should...

Page 27: ...RODE SEQUENCE BOARD CHASSIS EARTH g y p b br CHASSIS EARTH g y p or b w y y CONTROL THERMOSTAT OVERHEAT CUTOFF br L N E N L E b b br g y br C NC g y w 230 50Hz PERMANENT MAINS SUPPLY FUSED AT 3 AMP CI...

Page 28: ...llary 12 3 Overheat Cutoff Device diagram 12 1 12 2 and 12 2A Remove and support the electrical control box refer to Section 7 1 Remove the overheat cutoff electrical connections Disconnect the air pr...

Page 29: ...indow diagram 12 5 Remove the old self adhesive aluminium foil gasket and the old mica window Replace with a new mica window Peel off the backing paper and secure with new self adhesive aluminium foil...

Page 30: ...essure tubes and the electrical connections from the PCB release the screws and remove the switch When fitting the replacement make sure that the plastic tubes and electrical connections are made as s...

Page 31: ...on is remade onto the new fan assembly The polarity of the other connections is not important 12 15 Water Pressure Switch Sealed Water System Only Release the water pressure and drain refer to Section...

Page 32: ...27 Injector 100FF Diagram 10 6 278 197 3a 205726 Injector 120FF Diagram 10 6 278 196 4 203432 Pilot burner 100FF Diagram 10 7 278 023 4a 203434 Pilot burner 120FF Diagram 10 7 E00 998 5 2000801236 Mic...

Reviews: