
Supplied By www.heating spares.co Tel. 0161 620 6677
11
221481C
4 Flue and Appliance Preparation
STANDARD and SHORT FLUE
Diagram 4.2
A
TERMINAL ASSEMBLY
B
WALL LINER EXTENSION
C
CASE SEAL
D
FIXING STRAPS
E
FLUE HOOD
F
OUTLET DUCT
G
WALL LINER SLEEVE
H
BOILER UNIT
J
LUG
K
HOLE FOR CORD/STRING
L
BOTTOM LOCATION
A
D
B
K
J
E
F
L
G
C
H
FLUE DUCT
securing screw
Diagram 4.3
INNER AND OUTER CASING
2407
LUG
OUTER
CASE
INNER
CASE
OUTER
CASE
LUG
INNER CASE
SECURING
SCREWS (TOP)
OUTER CASE
SECURING
SCREW
INNER
CASE
INNER CASE
SECURING
SCREWS
(BOTTOM)
4.2 Appliance Preparation
Remove the controls cover by pulling it forwards and off.
Remove the outer case by undoing the screw at the bottom and
unhooking at the top.
Remove the inner case by undoing the screws at the top and
bottom, see diagram 4.3.
Remove the flue hood by releasing the wing nuts and remove
angle, see diagram 4.4. Lift off flue hood. Remove the two flue
duct screws.
Fit sponge seal “C” around the spigot at the back of the boiler,
adhesive face to the back of the case “H”, see diagram 4.2.
Take the side strips from packaging and hook them over the top
edge of the side panel and secure with a screw at the bottom.
Diagram 4.4
2769
WING NUT
FLUE
HOOD
HOOK
BOLT
TERMINAL
STRAP LUG
SECURING
ANGLE