background image

6

0020008566A

Diagram 4.3

Diagram 4.4

TOP SIDE FLUE - STANDARD

TOP REAR FLUE - STANDARD

Diagram 4.2

Diagram 4.5

TOP SIDE FLUE - TELESCOPIC

TOP REAR FLUE - TELESCOPIC

12658

12851

12850

12843

WALL THICKNESS

112

DRILL AND 
SCREW

BOILER
MOUNTING WALL

OUTSIDE
WALL FACE

Y

DRILL AND 
SCREW

COLLAR

WALL THICKNESS

112

DRILL AND 
SCREW

BOILER
MOUNTING WALL

OUTSIDE
WALL FACE

Y

COLLAR

Y

INNER
PLASTIC 
COLLAR

L

FLUE

OUTSIDE
WALL FACE

C

OUTER
RUBBER 
COLLAR

AIR 
DUCT

FLUE 
DUCT

 COLLAR

DRILL AND 
SCREW

Y

INNER
PLASTIC 
COLLAR

L

FLUE

OUTSIDE
WALL FACE

C

OUTER
RUBBER 
COLLAR

AIR 
DUCT

FLUE 
DUCT

 COLLAR

DRILL AND 
SCREW

4  Flue Preparation Telescopic and Standard Flue

4.2 Flue Length

Top Rear flue

 - 

Telescopic - 

with the flue elbow temporarily

fitted, measure the distance from the outside wall to the butt
joint,  see diagram 4.2. If the measurement 'Y' exceeds 525mm
, then the appropriate length of extension pipe  is  required, if the
dimension is less than 320mm DO NOT cut the flue,  it can
project to a maximum of 600mm,  if this is not desirable then a
Standard flue MUST be used and cut to length.

Top Rear flue

 - 

Standard - 

with the flue elbow temporarily

fitted, measure the distance from the outside wall to the butt
joint,  see diagram 4.3. If the measurement 'Y' exceeds 785mm
, then the appropriate length of extension pipe  is  required. The
minimum dimension is 187mm to suit a 75mm min wall thickness.

Top Side flue

 - 

Telescopic - 

with the flue elbow temporarily

fitted, measure the distance from the outside wall to the butt
joint,  see diagram 4.4. If the measurement 'Y' exceeds 525mm,
then the appropriate length of extension pipe  is  required, if the
dimension is less than 320mm DO NOT cut the flue,  it can
project to a maximum of 600mm,  if this is not desirable then a
Standard flue MUST be used and cut to length.

Top Side flue

 - 

Standard - 

with the flue elbow temporarily

fitted, measure the distance from the outside wall to the butt
joint,  see diagram 4.5. If the measurement 'Y' exceeds
785mm, then the appropriate length of extension pipe is
required. The minimum dimension for Lhd is 270 and Rhd 242
to suit a minimum wall thickness of 75mm.

Summary of Contents for cxi

Page 1: ...r to diagram 1 If you have been supplied with Standard horizontal flue pack Pt No 2000460360 or Pt No A2037300 you will find the instructions for the preparation and installation of these flues within...

Page 2: ...om inside the building when access to the outside wall face is not practicable The diagrams 2 1 to 2 4 describe the lengths achievable without the use of extensions or elbows TOP SIDE FLUE TELESCOPIC...

Page 3: ...5 These dimensions comply with the building regulations but they may need to be increased to avoid wall staining and nuisance from pluming depending on site conditions Plume Management Kit can be use...

Page 4: ...rom the boiler Where this line reaches the side wall a horizontal line should be marked The vertical centre line of the flue should then be marked at 176mm from the back wall see diagram 3 2 To allow...

Page 5: ...al flue accessories are available to suit your site conditions see diagram 4 1 The Glow worm Flue Options Guide available on request or through the web site describes in detail the necessary accessori...

Page 6: ...he flue it can project to a maximum of 600mm if this is not desirable then a Standard flue MUST be used and cut to length Top Rear flue Standard with the flue elbow temporarily fitted measure the dist...

Page 7: ...hrough two of the pre drilled holes in the collar Remove collar and drill two 3mm diameter holes in the elbow take care not to pierce the inner flue duct Insert the terminal flue duct remembering to e...

Page 8: ...ed conform to the safety and performance specification that we require Do not use reconditioned or copy parts that have not been clearly authorised by Glow worm 5 1 General Measurement of the products...

Reviews: