Installation Guide for MRI-1000
GS-08-1724, v 3.2
11
MRI-1000 Installation Record (Template):
The last phase of the installation is to document the installation and the status of the controller. Record
the following information
1.
Date
2.
Globalstar Phone Number
3.
Outdoor Unit Serial Number
4.
Junction Box Serial Number
5.
Color of LED in Junction Box
6.
Time of Test Phone call
7.
Name of Installer
8.
Pictures taken of the installation
Bracket on pole: __________yes/no
Junction box: __________yes/no
Power meter: __________yes/no
9.
Pictures of the location, taken from
the MRI-1000 looking in all
directions:
N, E, S, W: ____________(yes/no)
Other directions: _________(yes/no)
10.
Describe any other antennas or
equipment nearby