Global Power Technologies 33
S-8500
APPENDIX E
SERVICE AND INSTALLATION TOOLS
Tools required for service:
• 1
DC Voltmeter, 30V Accurate to 1%
• 1
3/16” hex key (Allan key)
• 2
7/16” wrench
• 2
1/2” wrench
• 2
9/16” wrench
• 1
5/8” wrench
• 1
11/16” wrench
• 1
7/8” wrench
• 1
1” wrench
• 2
Adjustable wrenches, that will open to 16 mm (5/8 in.)
• 1
Flat head screwdriver
• 1
Phillips head screwdriver
• 1
1.8 m (6 ft) step ladder (for any service requiring inspection of the rain cap or
exhaust)
Additional tools required for installation:
• 1
Lifting device capable of lifting 273kg (603lbs) under expected weather
conditions
• 2 shackles
• 1
Lifting strap, chain or cable
• 4
Bolts & nuts, #1/2-13 for mounting
• 1
Tape measure
Summary of Contents for S-8500
Page 4: ......
Page 6: ......
Page 28: ...Global Power Technologies 22 S 8500 This page is purposely left blank ...
Page 63: ...Global Power Technologies 57 S 8500 Figure 29 CP Panel wiring schematic ...
Page 65: ...Global Power Technologies 59 S 8500 Figure 30 DC DC Converter Connections ...
Page 66: ...Global Power Technologies 60 S 8500 Figure 31 DC DC Converter with CP Panel wiring schematic ...
Page 72: ...Global Power Technologies 66 S 8500 Figure 32 Flowchart Battery Charging Application Setup ...