COMMISSIONING
Preparation
1.
Check sounder cables and ensure all field connections are made. Ensure that all EOL Resistor are fitted to the last
sounder of each circuit.
2.
Connect sounder lines to panel
3.
Remove the mains fuse
4.
Connect mains supply according to local mains voltage Ensure good earth connection
5.
Fit batteries (do not connect)
6.
Insert mains fuse
7.
Connect batteries - observe correct polarity.
Commissioning
1.
If all is normal only the Green “supply”LED should be illuminated.
2.
If any Faults are indicated they should be corrected before proceeding.
3.
Initiate lamp test and confirm LEDs and internal buzzer operation.
4.
Test each key for correct functioning.
5.
Test all sounders, relays etc. for proper operation.
TESTING FIELD EQUIPMENT
Testing Sounders
1.
Introduce the Level 2 Access code (2244)
with the Buzzer OFF
.
2.
Initiate sounder pressing Sounders Activate/ Silence
3.
Press again to stop
Testing Relay Outputs
With the Addressable system in normal operating mode, activate a Fire Alarm and confirm operation of Fire relays. Test if
manual button Sounder activation, also activates the Fire relay.
On the Fault Relay test, generate a fault (example: remove the sounder circuit EOL or remove Mains Power) and verify the
Fault relay operation.
NOTE:
Communication faults between ORION-BCM LSC and the Addressable System will only be
signaled at the Addressable panel. Fault relay will not activate if ADLI-BCM is unplugged.