203-INST-UK-001 v1.0 

 02 Aug 2022 

 

Need assistance? +44 (0)1379 658300 [email protected] 

Page 7 of 21 

 

3.

 

The supporting structure must already be in place for the product. The dimensioning of the product will have taken into 
consideration the dimensions of the supporting structure including all weathering. More information about  supporting 
structure construction can be found in Glazing V

ision’s sales drawings. 

Please note that a minimum distance of 140mm 

from  the  structural  opening  to  any  surrounding  structured  must  be  felt  on  all  sides.  Sufficient  room  for  installation 
(including weathering) and maintenance must also be allowed for. 

 
4.

 

It is important to consider the type of tile or other roof finish to be used. The opening in the roof should ideally be positioned 
so that you get a full tile at the top and at the bottom of the product, avoiding the need to cut tiles down. 

 
 
5.

 

It is important to ensure that the area of installation is suitably prepared. The area surrounding the supporting structure 
should  be  clear  to  provide  safe  access  during  the  installation  works.  It  will  be  necessary  to  work  on  the  outside  and 
therefore suitable provisions should be made for safe handling of the product, including all relevant personal protective 
equipment (PPE) and safety systems for working at heights. 

 

6.

 

Before starting installation, Glazing Vision advises that the physical  supporting structure dimensions are cross-checked 
with those given for the order, to ensure the product will fit. The supporting structure will need to be within ± 10 mm of the 
ordered size (measured across the flats). The top surface of the supporting structure should be flat without undulations 
greater than ± 2 mm. Also check the diagonals to ensure that the supporting structure has been constructed square. The 
supporting structure must be weathered as per the sales drawings. If using any metallic waterproofing material, take care 
when applying it to the product/supporting structure, as if done incorrectly it can cause a thermal bridge which can lead 
to internal condensation and invalidate the product warranty. 
 

7.

 

These  products  can  be  very  heavy.  Glazing  Vision  strongly  recommends  that  a  structural  engineer  is  consulted  when 
designing the structure(s) that will support the product and the surrounding structure. Nothing in this manual or on Glazing 

Vision’s sales drawings

 constitutes a structural proposal. 

 

8.

 

Preparation of the roof prior to installation will vary depending on roof type and roofing materials. A few common scenarios 
are included in this manual. Please follow the applicable steps for your configuration. Glazing Vision strongly recommends 
that 

a ‘dry run’ (without any silicone

 or butyl) is completed before committing to the final installation. 

 

Sales Drawings 

Sales  drawings  for  the  Pitchglaze  can  be 

obtained  by  downloading  them  from  Glazing  Vision’s  website 

(www.glazingvision.co.uk/resources) or by contacting Glazing Vision.

 

 

 

Sales  drawings  should  accompany  this  installation  manual.  If  you  do  not  have  them  then  do  not  continue  the 
installation without them. 

 

Summary of Contents for Pitchridge

Page 1: ...203 INST UK 001 v1 0 02 Aug 2022 www glazingvision co uk 44 0 1379 658300 info glazingvision co uk Installation Manual Pitchridge...

Page 2: ...ssistance 44 0 1379 658300 info glazingvision co uk Page 2 of 21 Contents Section Description Page Introduction 3 Safety Information 4 Pre Installation Preparation 6 Preparation of the Roof 8 Installa...

Page 3: ...be noted that an installation by non approved installers will result in a reduced warranty period of just 2 years By following the correct installation procedure a reliable and high performing end re...

Page 4: ...t might pose a significant risk whilst working at height Use of scaffolding with all appropriate edging rails and inspection certification If specialist access or equipment is required e g a fall arre...

Page 5: ...safe working platform must be provided for any installation maintenance work carried out This includes suitable edge protection Glazing Vision cannot be held responsible for damage incurred during the...

Page 6: ...fall within 48 hours from signing the receipt of your delivery 2 Enclosed within the box containing this manual will be the required number of fixing woodscrews and a number of plastic packers as well...

Page 7: ...with those given for the order to ensure the product will fit The supporting structure will need to be within 10 mm of the ordered size measured across the flats The top surface of the supporting str...

Page 8: ...purposes only and may not be suitable for your installation These products can be very heavy Glazing Vision strongly recommends that a structural engineer is consulted when designing the structure s...

Page 9: ...resentation of your installation Please refer to Glazing Vision s sales drawings throughout the installation Glazing Vision advises to do a dry run prior to full installation to ensure openings are co...

Page 10: ...ep 2 Install the Cill Tilting Fillet Install a tilting fillet as shown not supplied Glazing Vision recommends that a hardwood or treated softwood fillet is used The length of the Cill Tilting Fillet s...

Page 11: ...Apply silicone underneath the flashing and if required fix the flashing in place using brass or stainless steel tacks not supplied Figure 5 Cill flashing in position Step 4 Place and Fix the Product...

Page 12: ...long jambs and cill Lay a continuous strip of butyl tape supplied onto the underlay hard up against the internal aperture as shown in figure 6b Figure 6b Continuous loop of butyl tape applied on top o...

Page 13: ...with the internal finishes The top angled face of the frame must align with the centreline or apex of the structural opening as shown in figure 6d Take care when positioning the product during final...

Page 14: ...ion of the second section Apply some silicone to the rectangular end of the chevron and slide them into place in the second section See figure 7a Figure 7a Chevrons Step 5b Place and fix section two L...

Page 15: ...p 5e Securing rooflight to structural opening Working inside the building drill 3 mm pilot holes into the supporting structure through the pre drilled holes in the product s framework Adjust the previ...

Page 16: ...Run a continuous thick fillet of silicone supplied along the entire length of both cills and all jambs Figure 8 Silicone the Cill and Jambs Whilst still wet excess silicone can be cleaned from the pr...

Page 17: ...the Jambs Apply 50 mm butyl tape supplied as part of flashing kit if specified otherwise use approx 1 5 mm double sided butyl tape to the full length of the gutter lip on both jambs sides Figure 9a B...

Page 18: ...e external span of the product The bottom edge of each apron should lap over the cills on both side of the Pitchridge flashing and should align with the bottom edge of the product cills The aprons may...

Page 19: ...rwise use code 4 nominally 1 8 mm thick flashing lead fit the lead soakers The soakers should tuck approximately 100 mm between the tiles slates should fold under the gutter of the product and should...

Page 20: ...opportunity to check the weathering overlap of the aprons and flashings and to check the silicone sealing the jambs Tile up to the batten below the product Fold and boss the cill flashing into final p...

Page 21: ...ions The finish must be built up to the internal dimension of the product see Glazing Vision s sales drawings No interior metal component for example edging strips for plastering may touch any part of...

Reviews: