Figure 6c
–
Fixing detail (from inside)
With the product
’s frame
in contact with the top of the supporting structure and most of the weight still supported by the
crane/lifting equipment, adjust the position of the product on the supporting structure so that the internal framework is equally
spaced and aligned with the internal finishes.
The top angled face of the frame must align with the centreline or apex of the structural opening as shown in figure 6d
Take care when positioning the product during final installation, as once the weight of the unit has been placed onto the sealants
it adheres to the supporting structure making repositioning difficult.
Once satisfied that everything is correctly positioned, carefully release the weight of the product. Remove the crane and lifting
equipment.
Figure 6d
–
Product placed centrally into aperture
Structural Opening
Structural Opening
centreline
First section of
Pitchridge