![background image](http://html1.mh-extra.com/html/glasdon/signmaster-led/signmaster-led_instructions_2230684001.webp)
SIGNMASTER LED 24V INSTALLATION KIT INSTRUCTIONS
Ensure that personnel carrying out this conversion have the relevant qualifications/certificates and all work
is carried out in accordance with BS6771:2008/I.E.E. Wiring Regulations 17th Edition.
Ensure that all relevant personnel read the points listed within this leaflet and that a copy is given to staff
involved with the installation and maintenance of this product.
Glasdon recommends that a full Health and Safety analysis is carried out prior to installation.
!
1
KIT CONTENTS
EQUIPMENT REQUIRED
MINIMUM HOLE DIMENSIONS
1
- Signmaster Bollard
x1
2
- M10 x 100 Screw
x4
3
- M10 x Ø50 White Washer
x4
4
- Spacer
x1
5
- Gasket
x1
6
- LED Housing
x1
7
- Concrete-In Plate
x1
8-
M10 x 70 Hex Head Bolt
x4
9
- M10 x Ø50 Silver Washer
x4
10
- Concrete-In Bars
x2
11
- IP68 Plug
x1
Allen Key 6mm
x1
Optional Extras
Installation Lid 100mm Angled Bend
-Ø17mm Spanner/Socket
-Spade
-Spirit Level
-Support Block x2
-Concrete Mix (we suggest using a quick setting
concrete i.e. QC10 in areas prone to vandalism).
1
2
3
4
6
7
8
5
10
11
9
430mm
450mm
430mm
Please note that diagrams are not to scale
Diagram A