6
Installation
1
Preparing the wall
2
Marking the locations
□
Determine the desired wall location for the cabinet.
□
Determine desired height for top of cabinet and mark a
horizontal line on the wall using a pencil.
□
Use a level to ensure the suspension rail markings will
be level before installing to the wall.
□
Remove the drawers from the vanity by pushing the bracket lever underneath the drawer box (refer to below image) and disconnect
the drawer box from the slide.
□
Measure the desired location of the vanity by placing into the wall and mark mounting hole guidelines on wall. Check alignment of
mounting hole guidelines against vanity base to ensure product is level.
CAUTION
: Consult an expert for the proper screws / Bolts
to use when attaching the various constructions, 2” screws
(not included) mentioned here do not match to all wall type.
Anchors are not required if brackets are installed in stud.