![Girard Products G-1500 Owner'S Manual Download Page 37](http://html1.mh-extra.com/html/girard-products/g-1500/g-1500_owners-manual_2229120037.webp)
40 |
P a g e
9. With the awning open about 18”,
unband the high tension arm very carefully.
Slowly
guide it into position on the lead rail and fasten with the 17mm bolt and nut.
10. Attach the front of the arm to its connection point at the lead rail by replacing the pivot
pin from the top and securing it with the retaining ring (F-clip). (Figure 28) Then slide
into the lead rail connection and replace the nut and washer. At the shoulder assembly
of the arm, tighten both lock nuts until they are one turn from being tight. Adjust the
arms’ pitch angle to match the others by rotating the head of the pitch-adjustment
screw as follows; rotate in a clockwise direction to lower the arm, or rotate
counterclockwise to raise it. Fully tighten both lock nuts on the shoulder assembly.
Please refer to the “ADJUSTING THE PITCH ANGLE” section of this manual.
(Figure 28)
SHOULDER ASSEMBLY
Lock nuts
Pitch
adjustment
assembly
Spacer bushing
Pivot bolt
Lock nuts
Arm elevator
screw
Pitch
adjustment bolt
Summary of Contents for G-1500
Page 11: ...14 P a g e ...
Page 41: ...44 P a g e ...
Page 42: ...45 P a g e ...
Page 43: ...46 P a g e ...
Page 44: ...47 P a g e ...
Page 45: ...48 P a g e NOTES ...