10. At the juncture of the two awnings inside of the cassette are two glide angles. Move the
right glide angle 9” from the center and tighten until secure. (The awning should be open
about 24”–36” when performing this function.) With the removable bracket on the right, slide
the fabric onto the roller tube and roll the fabric over the TOP of the roller tube.
11. With the fabric on the roller tube, insert the fabric end into the lead rail connector. Slowly
unroll the fabric until you are up to the awning box. Place the right side into the glide angle
that you tightened down in step 10. (Figure 9)
12. Turn the left-hand side of the center roller tube towards the TOP (counter-clockwise) 13
complete rotations to tighten the spring. Place the left glide angle over the left side of the
center roller tube to hold it in place, and tighten down the left glide angle. (Figure 10)
13. Extend the awning to its full projection. If you have excessive sag in the center roller
fabric, repeat step 12 and add additional rotations.
Summary of Contents for G-1500
Page 11: ...14 P a g e ...
Page 41: ...44 P a g e ...
Page 42: ...45 P a g e ...
Page 43: ...46 P a g e ...
Page 44: ...47 P a g e ...
Page 45: ...48 P a g e NOTES ...