Screwing down directly

The energy profile can be set up directly on the 
ground on a solid base, e.g. a cement or asphalt 
surface.

.

1. Drill a hole at the intended mounting location 

and insert the accompanying plug.

2. Guide the cables through the profile base and 

mount the base to the ground with the 
accompanying hexagon bolt.

3. Guide the cables into the accompanying 

conduit boxes and connect the plastic-
sheathed cables which reach the device 
units. 

4. Connect the lighting element (if present) (see 

Page 5).

5. Connect the earth cable of the energy profile 

to the earth terminal of the profile base.

6. Place the energy profile on the profile base 

and fasten it with the three Allen bolts 
(M6 x 14).

7. For energy profiles with a lighting element, 

insert the light and close the profile with the 
cover.

Outfitting available device units

The empty units of the energy profiles can be 
outfitted with components from the TX_44 or 
System 55 switch design ranges. 

Please install the flush-mounted inserts as 
follows:
1. Connect the device inserts.
2. Lay the connection lines in the conduit boxes. 
3. Fit the inserts with the accompanying sealing 

pans. The profile has markings to which the 
supporting rings of the device can be aligned. 
This ensures that the frames are inserted later 
on in such a way which ensures splash 
resistance.

4. Set down the bottom section of the TX_44 

frame and fasten it with the accompanying 
Phillips-head screws (B 3.5 x 16).

5. Fit the central inserts and screw them down if 

necessary.

6. Attach the adapter plates with a hinged cover 

if necessary.

7. Clip on the cover plate of the frame and press 

in the Torx screws.

i

Profile with no lighting element

For profiles with no lighting element, all devices 
and TX_44 cover frames must be mounted 
before the profile cover is set in place. To keep 
the profile splash-resistant, the top edge of the 
TX_44 cover frame must be flush with the top 
edge of the profile.

i

Installation suggestion

Prepare the energy profile in your workshop: 
Install the devices and lay the corresponding 
plastic-sheathed cables in the conduit boxes. 
Then only the conduit boxes need be wired up 
on site.

i

Integration of System 55 inserts

Inserts from System 55 must be installed via a 
TX_44 adapter plate with a hinged cover. An 
overview of the inserts which can be combined 
with each adapter plate is found in the current 
Gira catalogue. 

Summary of Contents for 1345 26

Page 1: ...g Instructions Energy profile with three empty units height 491 mm 1345 26 28 Energy profile with lighting element and three empty units height 769 mm 1349 26 28 Energy profile with six empty units height 769 mm 1351 26 28 ...

Page 2: ... e g in an entrance area The Gira energy profile is available in different versions in the colours anthracite and aluminium Examples Energy profile with three empty units height 491 mm Order No 1345 26 28 Energy profile with lighting element and three empty units height 769 mm Order No 1349 26 28 Energy profile with six empty units height 769 mm Order No 1351 26 28 Device presentation Here the ene...

Page 3: ...n bolt 5 Guide the cables into the accompanying conduit boxes and connect the plastic sheathed cables which reach the device units 6 Connect the lighting element if present see Page 5 7 Connect the earth cable of the energy profile to the earth terminal of the profile base 8 Place the energy profile on the profile base and fasten it with the three Allen bolts M6 x 14 9 For energy profiles with a l...

Page 4: ... Fit the inserts with the accompanying sealing pans The profile has markings to which the supporting rings of the device can be aligned This ensures that the frames are inserted later on in such a way which ensures splash resistance 4 Set down the bottom section of the TX_44 frame and fasten it with the accompanying Phillips head screws B 3 5 x 16 5 Fit the central inserts and screw them down if n...

Page 5: ...e for information on how each device is connected Lighting element connection The lighting element of the energy profile is already pre wired up to the connection terminal Proceed as follows to connect the lighting element 1 Remove the connection box from the lower opening of the energy profile and open it 2 Connect the lighting element via the N terminals The available terminals can be used for t...

Page 6: ... g for path illumination 5 Set the profile cover in place and fasten it with both cover screws Technical data Dimensions W x H x D Profile base 229 x 10 x 155 mm Profile 142 x 491 x 75 mm or 142 x 769 x 75 mm Protection type IP 44 with closed device covers Connections terminal screws 1 x 4 mm2 or 2 x 2 5 mm2 Lamp Light sources with E27 treading of the energy efficiency classes A to E Power 21 W ma...

Page 7: ...rements via the specialist trade Please submit or send faulty devices postage paid together with an error description to your responsible salesperson specialist trade installation company electrical specialist trade They will forward the devices to the Gira Service Center ...

Page 8: ...Co KG Electrical installation systems Industriegebiet Mermbach Dahlienstraße 42477 Radevormwald P O Box 12 20 42461 Radevormwald Germany Phone 49 0 2195 602 0 Fax 49 0 2195 602 191 www gira com info gira com 10866543 49 19 ...

Reviews: