![Gill MetPak II User Manual Download Page 14](http://html1.mh-extra.com/html/gill/metpak-ii/metpak-ii_user-manual_2227432014.webp)
Installation
MetPak II User Manual
©
Gill Instruments Ltd
Last Change
Page 10
20 August, 2010
2.2.4
Communication connections
To connect MetPak II:
1.
Open MetPak II’s connector box by unfastening the four screws.
2.
Locate connector J5 (see Figure 4). Carefully pull the connector off its circuit
board pins.
3.
Strip the cable wires to 8mm.
4.
Pass the cable through one of the gland nuts.
5.
Connect your cable as shown in the following diagrams:
Gill USB Cable
Figure 5
RS232
Figure 6
RS422
Figure 7
SDI-12
Figure 8
6.
Attach the cable’s screen wires to the terminal post (see Figure 4).
7.
After connection, securely tighten the gland nut to prevent moisture ingress.
NOTE.
Ensure that MetPak II is configured for the chosen communications method
(see page 25)
Figure 4
Internal view of the hub box
J4
J5 Pin 8
J5 Pin 1
Hex Terminal
Post
J1
J5, showing RS232 to USB
Configuration Cable Wires
Summary of Contents for MetPak II
Page 36: ......