![Gill AGX M4 POLE VAULT Manual Download Page 5](http://html1.mh-extra.com/html/gill/agx-m4-pole-vault/agx-m4-pole-vault_manual_2227415005.webp)
5
4
3
3
5
2
B
B
SECTION B-B
SCALE 1 : 4
Section View
Hinge UP
ASSEMBLING THE BASES
Spin a nut down onto each post. Place a washer
on top of each nut.
Slide the leveling plate down over the posts as
shown.
Make sure the hinge is upwards.
Secure the plate from the top with washer, lock
washer and nut.
#
Part #
Description
Qty.
1
74011010
Base Weldment
1
2
HDWE01293
5/8"-11 X 3" FLAT-HEAD SOCKET CAP SCREW; ZINC PLATED
4
3
HDWE05023
5/8" FLAT WASHER; SS
4
4
HDWE04010
5/8" SPLIT RING LOCK WASHER; SS
4
5
HDWE03102
5/8"-11 THIN HEX NUT; ARMOR COAT
4
10
hdwe01294
5/8"-11 X 1-3/4" HEX HEAD CAP SCREW; GR8; ARMOR COAT
4
11
3060T47
4
12
M1291
3/8"-16 Nylock hex nut, standard height
8
13
HDWE050040
E0
3/8" Flatwasher
8
#
Part #
Description
Qty.
1
74011010
Base Weldment
1
2
74011012
Leveling Plate
1
3
HDWE05023
5/8" FLAT WASHER; SS
8
4
HDWE04010
5/8" SPLIT RING LOCK WASHER; SS
4
5
HDWE03102
5/8"-11 THIN HEX NUT; ARMOR COAT
8
www.gillathletics.com
Copyright
2016 by Gill Athletics.
All rights reserved.
800-637-3090
10/8/2018
INST740110CXXYYSP
Page 5 of 17
740110CXXYYSP - AGX M4 POLE VAULT STANDARDS
INSTRUCTIONS