0552-999-03_05.98.p65
3-4
29
30
15
Fig. 8
20
15
31
32
34
Fig. 9
15
Electrical connections
Warning:
Always pull out the power plug before working on
the drive unit!
- All the electrical elements mounted within the drive unit are con-
nected.
- The cables of the external operating and safety elements are intro-
duced into the drive unit from above (behind mains plug socket).
- The cables outside of the drive unit have to be fastened by the
appropriate means.
Warning:
Any operating elements to be installed by customers
must not be mounted within the pivoting
range of the door!
- All the connections on the control unit are made according to dia-
gram 0141-199 in the drive unit cover.
- Checking:
• If no photoelectric cell is connected on plug X3,
terminals 4 - 8 , a bridge connection must be
made between terminal 5 and terminal 7.
• On plug X3, terminals 9 - 10 and 9 - 11, either
a bridge connection must be made or the cable
of the safety elements must be connected.
• The remote radio control F7000 must be pro-
grammed with a personal code. This code must
be the same for the transmitter and the receiver.
Assembly according to the enclosed respective
instructions.
Commissioning
- Checking
• Uncouple the door on the sliding carriage (15) by
pulling the red knob. Manually open and close
the door. It should move easily and without
hindrance.
• In the horizontal line, the driver angle (14) must
not transmit any forces onto the sliding carriage
(15).
• Are all the electrical connections OK?
• Have the DIL switches been adjusted according
to the required function? (See diagram in the
cover).
Standard function:
Step-by-step func. OPEN-STOP-CLOSE (SS AHZ)
S 1.1
ON
S 1.2
OFF
S 1.3
ON
S 1.4
OFF
S 1.5
OFF (illumination time)
- Mount the cover and plug in the power plug.
- When the drive unit is taken into operation for the first time with
a door mass, the setting-up procedure is automatically carried
out. The travel distance, the door mass and the friction are mea-
sured and memorized.
Attention:
During the setting-up procedure, the door must not
be hindered.
- The first movement that the drive unit wants to carry out is a slow
closing procedure.
- Give an impulse (by radio control or push-button); the drive unit
opens at slow speed.
- Check whether the completely opened door touches the door
stops on both sides (if there are any).
- Adjust the stop piece for the open position (29) in the drive unit.
Slightly loosen the screws (30) and push the stop piece until it
meets the sliding carriage (15). Then retract the stop piece by
approx. 20 mm and tighten the screws (30). Fig. 8
- Give an impulse; the door closes.
- Adjust the stop piece for the closed position (31) in the drive unit.
Slightly unscrew the screws (32), push the stop piece until it tou-
ches the sliding carriage (15) (measure 15 mm). Tighten the
screws (32). Fig. 9
- Give an impulse; the door closes at normal speed. A further
impulse causes the door to open at normal speed.
- The illumination time has been adjusted for approx. 180 sec. It
can be changed at the potentiometer R49, provided that the DIL
switch S 1.6 is positioned on OFF (see diagram in the cover).
- Further adjustments can be made by means of the control device
BEDIS (option).
- Should the cable already have been lengthened after several
door movements, the position of the stop piece for the closed
position (31) must be corrected so that it touches the sliding
carriage (15) in the CLOSED position.
- If the setting-up procedure has not been carried out correctly, it
can be repeated by pressing the reset key (34) (blue button)