Installation
Page 16
MDE-3985L Encore® Installation Manual · May 2006
1
Verify that the hoisting brackets are tight. Use provided bolts with the brackets or grade 8
bolts.
2
Use three nylon slings (safety lift factor of 5) and four screw pin shackles along with hoisting
brackets to lift unit onto island. See
Figure 3-2: Lifting with Hoisting Brackets
.
Note: Do not run slings around columns or under the upper piping housing. This will damage
columns or sheathing.
Figure 3-2: Lifting with Hoisting Brackets
3
Lift and position unit to work area for modification or onto island.
4
Remove slings and shackles.
Mounting Unit To Island
Before placing a unit on an island determine the correct location of piping for the unit involved
and the proper orientation of the unit. A common installation error is to install the unit
bcakward resulting in modifications or delaying installation.
Mount unit using mounting bolt locations specified. Seal base as required.
Fill in any openings from the smaller length Encore cabinet to the potentially longer pit
box opening for The Advantage wide frame or other units. Seal as required.
Three nylon
slings
Two of four
hoisting
brackets for
attaching
nylons slings
with screw
pin shackles.
Two of four
hoisting brackets