System Hardware Installation
- 36 -
3-9 Installing the M.2 Device and Heat Sink
WARNING:
Installation of the thermal pad over the M.2 device is required when installing an M.2 device.
Lack of the thermal pad may result in system overheat and throttle the system performance.
CAUTION
The position of the stand-off screw will depend on the size of the M.2 device. The stand-off screw
is pre-installed for 22110 cards as standard. Refer to the size of the M.2 device and change the
position of the stand-off screw accordingly.
Follow these instructions to install the M.2 device and heat sink:
1. Insert the M.2 device into the M.2 connector.
2. Press down on the M.2 device.
3. Install the thermal pad of the M.2 device to the M.2 device.
4. Press down on the thermal pad.
5. Secure the M.2 device and its thermal pad to the motherboard with a single screw.
6. Reverse steps 1-4 to remove the M.2 device.
1
4
2
3
5
Summary of Contents for H252-Z10
Page 1: ...H252 Z10 AMD EPYC 7002 UP Server System 2U 4 nodes User Manual Rev 1 0 ...
Page 10: ...This page left intentionally blank ...
Page 16: ... 16 Hardware Installation 1 3 System Block Diagram ...
Page 22: ...System Appearance 22 This page left intentionally blank ...
Page 34: ...System Hardware Installation 34 1 2 4 3 5 ...
Page 40: ...System Hardware Installation 40 HDD Back Plane Board Signal On Board SATA Top ...
Page 41: ... 41 System Hardware Installation SATA1 SATA3 On Board SATA Bottom SATA2 SATA4 NVMe Top ...
Page 42: ...System Hardware Installation 42 N1B N1A N3B N3A NVMe Bottom N2B N2A N4B N4A ...
Page 54: ...BIOS Setup 54 5 2 4 1 Serial Port 1 2 Configuration ...
Page 60: ...BIOS Setup 60 5 2 7 1 CPU 0 Information ...
Page 66: ...BIOS Setup 66 5 2 11 SATA Configuration ...
Page 71: ... 71 BIOS Setup 5 2 16 AVAGO MegaRAID Configuration Utility ...
Page 73: ... 73 BIOS Setup 5 2 17 Intel R I350 Gigabit Network Connection ...
Page 75: ... 75 BIOS Setup 5 2 18 VLAN Configuration ...
Page 86: ...BIOS Setup 86 5 3 3 3 NVDIMM ...