![GIGA-BYTE TECHNOLOGY GIGABYTE GS-S12-P04R User Manual Download Page 67](http://html.mh-extra.com/html/giga-byte-technology/gigabyte-gs-s12-p04r/gigabyte-gs-s12-p04r_user-manual_2222613067.webp)
- 67 -
Hazardous FAN
CAUTION:
This server contains hazardous moving fan blades, keep fingers and other bodyparts away.
Disconnect all power supply cords before servicing. Connect power supply cord only after all the covers are properly
installed.
Hazardous Energy
CAUTION:
This server contains hazardous energy over 240VA on the backplane. To prevent accidental
short circuit, always insert the HDD trays after servicing.
CAUTION:
Slider/rail mounted equipment is not to be used as a shelf or a work space.
Rack Mount Instructions
The following or similar rack-mount instructions are included with the installation instructions:
A) Elevated Operating Ambient - If installed in a closed or multi-unit rack assembly, the operating ambient
temperature of the rack environment may be greater than room ambient. Therefore, consideration should
be given to installing the equipment in an environment compatible with the maximum ambient temperature
(Tma) specified by the manufacturer.
B) Reduced Air Flow - Installation of the equipment in a rack should be such that the amount of air flow required
for safe operation of the equipment is not compromised.
C) Mechanical Loading - Mounting of the equipment in the rack should be such that a hazardous condition is
not achieved due to uneven mechanical loading.
D) Circuit Overloading - Consideration should be given to the connection of the equipment to the supply circuit and
the effect that overloading of the circuits might have on overcurrent protection and supply wiring. Appropriate
consideration of equipment nameplate ratings should be used when addressing this concern.
E) Reliable Earthing - Reliable earthing of rack-mounted equipment should be maintained. Particular attention
should be given to supply connections other than direct connections to the branch circuit (e.g. use of power
strips).
Disconnect 2 power supply cords before servicing
For more information, visit our website at: https://www.gigabyte.com
Summary of Contents for GIGABYTE GS-S12-P04R
Page 25: ...6 25 ...
Page 68: ... 68 ...
Page 69: ... 69 ...
Page 70: ... 70 ...
Page 71: ... 71 ...