3
G
. 1
0.
03
.0
9
4. Technical specifications
5. Installing flange and burner
- Install the sliding flange and seal loosely on the boiler door.
- Insert the burner.
- Follow the tightening sequence of the screws.
- Lift the burner when tightening the screws.
The immersion depth of the burner pipe to
the respective burner chamber is optimally set via the sliding flange.
6. Establishing the electrical connection of the boiler controller
The electrical connection must be made in the enclosed male connector i.a.w. the wiring diagram taking into
consideration local regulations. The supply line must be protected with a 10 A fuse and for convenience be
laid as a flexible cable. If the male connector has already been wired, carry out a control of the connections
i.a.w. the accompanying wiring diagram.
GL10.1-V-L
GL10.1-L
GL10.2-V-L
GL10.2-L
Burner output
in kh/h
in kW
1.30 - 3.40
15.5 - 40.3
1.51 - 3.40
18.0 - 40.3
2.10 - 5.65
25.0 - 67.0
2.95 - 5.65
35.0 - 67.0
Recommended
boiler output in kW (92%)
14.2 - 37.0
16.5 - 37.0
22.5 - 62.0
22.5 - 62.0
Voltage
1 / N /PE ~ 50 Hz / 230 V
Power consumption in W (max.)
Start / operation
305 / 214
230 / 132
330 / 240
240 / 150
Weight in kg (approx.)
11
Noise emission
in dB (A)
58
58
59
59
B4
S3
T2
T1
N
L1
0000
N
P E
L 1
230 V
50 Hz
F
1
1
Empfehlung
max. 10A
Q
1
F
3
F
2
1
H
1
3
H
1
1
P
1
1
N
N
Recommended
max. 10 A