
8
F
IG
.
1
L
INKAGE
P
OINTS
Using The Transport Box
Step 5:
Ensure that the Transport Box is properly and securely
fitted to tractor before operation.
Step 6:
Lift box from ground using the tractors lift arms.
Step 7:
The trip mechanism on the transport box can be
worked by pulling on the rope to trip the box / empty a load.
To reset the box back to its fixed position, simply drop the box
to ground level where the trip mechanism will automatically
reset.
Always ensure the tripping mechanism has returned to
its lock position before reusing after tipping.
Step 8:
When
removing the box from the tractor,
steps 2-4
on
previous page should be repeated in reverse order, making
sure to set the power box on level ground.
Top Link Linkage
Arm Linkage Points