Gibney Steel Products T2 4ft User Handbook Manual Download Page 6

 

Maintenance 

 

This unit is designed to incorporate low maintenance, but the 
following points should be taken note of: 

 

Before  performing  any  maintenance  on  the 
implement  ensure  that  your  tractor  is  powered  off, 
the handbrake is applied and the ignition key has been 
removed. 
 

 

The machine should be propped up with appropriate 
support before performing any maintenance work. 
 

 

All  moving  parts  should  be  checked  before  use  to 
ensure  nothing  is  worn  or  damaged  and  to  ensure 
none of the fasteners have become loose over time. 

 

 

Ensure  that  all  hinges  are  greased  frequently  and 
check for any damages on the implement that would 
hinder the safe operation of the implement. 
 

 

If  any  parts  are  worn,  they  should  be  replaced 
immediately before use. 
 

 

Ensure that all warning stickers are always kept clean 
and in good condition. 

 

 

The manufacturer will not be held accountable for any 
damages  or  injuries  caused  by  unauthorised  repair, 
alterations or misuse of the implement. 

Summary of Contents for T2 4ft

Page 1: ...NEY STEEL PRODUCTS LTD T2 Transport Box 4ft 5ft 6ft USER S HANDBOOK GIBNEY STEEL PRODUCTS LTD Moylagh Oldcastle Co Meath Tel 049 8541302 Fax 049 8541760 Email sales gibneysteel com Web www gibneysteel...

Page 2: ...tents Introduction 3 Safety Notes 3 Maintenance 6 Operation 7 Mounting Implement onto tractor 7 Using The Transport Box 8 EU DECLARATION of CONFORMITY 9 European Standards 10 Standard Conditions of Sa...

Page 3: ...u an explanation on the operation and maintenance of the Transport Box It is important that you read and understand these instructions before operating this machine for the first time Anyone within th...

Page 4: ...ised personnel operate the implement It is the responsibility of the owner to ensure that there are no third persons or animals within the area of the machine before operation Ensure the Transport Box...

Page 5: ...O NOT make any attempts to manually move the implement DO NOT attach the implement to a tractor which would become unstable when the implement is being operated at its full capacity Take note of the m...

Page 6: ...ving parts should be checked before use to ensure nothing is worn or damaged and to ensure none of the fasteners have become loose over time Ensure that all hinges are greased frequently and check for...

Page 7: ...sition to attach onto arm linkage of Transport box Step 3 After arm linkage has been attached securely the tractor top link should be adjusted to suitable length and attached to tractor and transport...

Page 8: ...ing on the rope to trip the box empty a load To reset the box back to its fixed position simply drop the box to ground level where the trip mechanism will automatically reset Always ensure the trippin...

Page 9: ...9 EU DECLARATION of CONFORMITY...

Page 10: ...ly practicable all appropriate EU standards have been employed The following harmonised standards are an example of standards employed during the design and construction of the assembly EN ISO 12100 2...

Page 11: ...11 Spare Parts Item Description Part No Quantity 1 Dual Implement Pin Z202235 2 2 Linch Pins 7 16 P385 2 3 Linch Pins 1 4 P384 2 4 Spring GSP SPR01 1 McHugh Components Part Numbers...

Page 12: ...the Supplier 2 Warranties The Supplier warrants that At the time of sale it will have title to see the goods to the customer and the goods sold to the customer will conform to the specification for t...

Reviews: