Gibney Steel Products T2 4ft User Handbook Manual Download Page 4

 

 

Improper  use  of  the  machine  can  endanger  the 
machine, material assets of the owner or third persons 
and lead to performance issues with the machine. 
 

 

It is the responsibility of the owner of the implement 
to  provide  the  operator  with  the  User  Manual  and 
ensure  that  they  have  read  and  understood  them 
before they work the machine. 
 

 

It  is  the  obligation  of  the  owner  of  the  machine  to 
ensure  that  only  authorised  personnel  operate  the 
implement. 
 

 

It  is  the  responsibility  of  the  owner  to  ensure  that 
there are no third persons or animals within the area 
of the machine before operation. 
 

 

Ensure  the  Transport  Box  is  correctly  and  securely 
attached to the back of your operating vehicle. 

 

 

Detaching  the  implement  from  the  tractor  requires 
extra care.  Always ensure that the machine is stable 
and  positioned  on  a  safe  and  level  surface  before 
removal. 

 

 

Attaching and detaching of the implement should be 
carried out by only one operator and there should be 
no other people within the area of the implement or 
in the tractor. 
 

Summary of Contents for T2 4ft

Page 1: ...NEY STEEL PRODUCTS LTD T2 Transport Box 4ft 5ft 6ft USER S HANDBOOK GIBNEY STEEL PRODUCTS LTD Moylagh Oldcastle Co Meath Tel 049 8541302 Fax 049 8541760 Email sales gibneysteel com Web www gibneysteel...

Page 2: ...tents Introduction 3 Safety Notes 3 Maintenance 6 Operation 7 Mounting Implement onto tractor 7 Using The Transport Box 8 EU DECLARATION of CONFORMITY 9 European Standards 10 Standard Conditions of Sa...

Page 3: ...u an explanation on the operation and maintenance of the Transport Box It is important that you read and understand these instructions before operating this machine for the first time Anyone within th...

Page 4: ...ised personnel operate the implement It is the responsibility of the owner to ensure that there are no third persons or animals within the area of the machine before operation Ensure the Transport Box...

Page 5: ...O NOT make any attempts to manually move the implement DO NOT attach the implement to a tractor which would become unstable when the implement is being operated at its full capacity Take note of the m...

Page 6: ...ving parts should be checked before use to ensure nothing is worn or damaged and to ensure none of the fasteners have become loose over time Ensure that all hinges are greased frequently and check for...

Page 7: ...sition to attach onto arm linkage of Transport box Step 3 After arm linkage has been attached securely the tractor top link should be adjusted to suitable length and attached to tractor and transport...

Page 8: ...ing on the rope to trip the box empty a load To reset the box back to its fixed position simply drop the box to ground level where the trip mechanism will automatically reset Always ensure the trippin...

Page 9: ...9 EU DECLARATION of CONFORMITY...

Page 10: ...ly practicable all appropriate EU standards have been employed The following harmonised standards are an example of standards employed during the design and construction of the assembly EN ISO 12100 2...

Page 11: ...11 Spare Parts Item Description Part No Quantity 1 Dual Implement Pin Z202235 2 2 Linch Pins 7 16 P385 2 3 Linch Pins 1 4 P384 2 4 Spring GSP SPR01 1 McHugh Components Part Numbers...

Page 12: ...the Supplier 2 Warranties The Supplier warrants that At the time of sale it will have title to see the goods to the customer and the goods sold to the customer will conform to the specification for t...

Reviews: