Gibney Steel Products T2 4ft User Handbook Manual Download Page 5

 

 

Prior to operating the implement ensure that you are 
familiar  with  all  the  components,  functions  and 
controls of the machine.      

 

 

 

Under no circumstances should anyone under the age 
of 16 operate the implement.

 

 

 

Keep  hands  and  limbs  well  away  from  the  moving 
parts  of the  implement  and  from  between  the  hitch 
and the main body to avoid injury.

 

 

 

DO  NOT  make  any  attempts  to  manually  move  the 
implement 
 

 

DO  NOT  attach  the  implement  to  a  tractor  which 
would become unstable when the implement is being 
operated  at  its  full  capacity.    Take  note  of  the 
maximum loads allowed on the machine. 
 

 

Never  operate  the  machine  on  ground  where  it  will 
render the tractor unstable.  Take extra care when the 
machine is being operated on sloping ground. 
 

 

The  Transport  Box  is  not  to  be  used  under  any 
circumstance as a means of personal transport as it is 
unsuitable for the safe transportation of passengers.

 

 

 

Summary of Contents for T2 4ft

Page 1: ...NEY STEEL PRODUCTS LTD T2 Transport Box 4ft 5ft 6ft USER S HANDBOOK GIBNEY STEEL PRODUCTS LTD Moylagh Oldcastle Co Meath Tel 049 8541302 Fax 049 8541760 Email sales gibneysteel com Web www gibneysteel...

Page 2: ...tents Introduction 3 Safety Notes 3 Maintenance 6 Operation 7 Mounting Implement onto tractor 7 Using The Transport Box 8 EU DECLARATION of CONFORMITY 9 European Standards 10 Standard Conditions of Sa...

Page 3: ...u an explanation on the operation and maintenance of the Transport Box It is important that you read and understand these instructions before operating this machine for the first time Anyone within th...

Page 4: ...ised personnel operate the implement It is the responsibility of the owner to ensure that there are no third persons or animals within the area of the machine before operation Ensure the Transport Box...

Page 5: ...O NOT make any attempts to manually move the implement DO NOT attach the implement to a tractor which would become unstable when the implement is being operated at its full capacity Take note of the m...

Page 6: ...ving parts should be checked before use to ensure nothing is worn or damaged and to ensure none of the fasteners have become loose over time Ensure that all hinges are greased frequently and check for...

Page 7: ...sition to attach onto arm linkage of Transport box Step 3 After arm linkage has been attached securely the tractor top link should be adjusted to suitable length and attached to tractor and transport...

Page 8: ...ing on the rope to trip the box empty a load To reset the box back to its fixed position simply drop the box to ground level where the trip mechanism will automatically reset Always ensure the trippin...

Page 9: ...9 EU DECLARATION of CONFORMITY...

Page 10: ...ly practicable all appropriate EU standards have been employed The following harmonised standards are an example of standards employed during the design and construction of the assembly EN ISO 12100 2...

Page 11: ...11 Spare Parts Item Description Part No Quantity 1 Dual Implement Pin Z202235 2 2 Linch Pins 7 16 P385 2 3 Linch Pins 1 4 P384 2 4 Spring GSP SPR01 1 McHugh Components Part Numbers...

Page 12: ...the Supplier 2 Warranties The Supplier warrants that At the time of sale it will have title to see the goods to the customer and the goods sold to the customer will conform to the specification for t...

Reviews: