![Ghibli 150S100 Use And Maintenance Download Page 76](http://html1.mh-extra.com/html/ghibli/150s100/150s100_use-and-maintenance_2220258076.webp)
Fig. 29
1
1
4
5
2
3
Fig. 30
1
EN - 30
EN
OPERATIONS TO
PERFORM WEEKLY
11.1.e - Cleaning the clean water fil-
ter (Fig. 29)
- Unhook the filter (1) from the fast release
mounts (2) and remove it from the mount
(3).
- Rotate the filter (1) to remove it from the
machine.
- Remove the cap (4) and take out the filter
cartridge (5).
- Clean the filter cartridge (5) using running
water.
- Replace all the components in reverse
order.
OPERATIONS TO BE
PERFORMED EVERY
3 MONTHS
11.1.f - Check the wear status of the
steering chain (Fig. 30)
- Check the wear and corrosion status of
the chain (1) found beneath the machine
near the front wheel.
If the chain appears corroded, it must be
replaced.
Contact the technical assistance service.
Summary of Contents for 150S100
Page 42: ...P P R BR R R R R R R BR Y W G V B GR GR L I 38 IT SCHEMA ELETTRICO E112...
Page 44: ...20 21 22 23 24 25 27 26 I 40 IT E112...
Page 46: ......
Page 84: ...P P R BR R R R R R R BR Y W G V B GR GR L EN 38 EN WIRING DIAGRAM E112...
Page 86: ...20 21 22 23 24 25 27 26 EN 40 EN E112...
Page 88: ......
Page 126: ...P P R BR R R R R R R BR Y W G V B GR GR L FR 38 FR SCH MA LECTRIQUES E112...
Page 128: ...20 21 22 23 24 25 27 26 FR 40 FR E112...
Page 130: ......
Page 168: ...P P R BR R R R R R R BR Y W G V B GR GR L DE 38 DE ELEKTRISCHE SCHALTPL NE E112...
Page 170: ...20 21 22 23 24 25 27 26 DE 40 DE E112...
Page 172: ......
Page 210: ...P P R BR R R R R R R BR Y W G V B GR GR L ES 38 ES ESQUEMA EL CTRICOS E112...
Page 212: ...20 21 22 23 24 25 27 26 ES 40 ES E112...
Page 214: ......
Page 252: ...P P R BR R R R R R R BR Y W G V B GR GR L PT 38 PT DIAGRAMA ESQUEMA EL TRICOS E112...