GF-8 Xten Crane System Instruction Manual
Page: 3
General Assembly Procedure – GF–8
Before and during assembly observe the Safety Guidelines.
For all GF-8 Standard-Versions:
1. Secure the base dolly so that it cannot move or roll. Lock all wheel brakes. Move the
steering rod towards the centre of the dolly or remove it so that the set-up personnel
do not trip over it.
2. For the Standard-Versions 1 to 8 bolt the 90cm crane mounting column to the base
dolly (pivot height 154cm ). Make sure that the 4 locking bolts are locked securely.
Tip
:
The carrying handle on the bazooka should point away from the steering end
of dolly.
Locked
wheel brake
on Base Dolly
Base Dolly with 90cm / 3ft Mounting Column and
Pivot Seection (Versions 1-8)
The 30cm / 1ft column extension is used in versions 9 to 18 to increase the pivot
height from 154cm to 184cm. It is connected to the standard GF-8 column with 4
locking nuts and bolts. Make sure that the 4 locking bolts are locked securely.
As an option a 3 stage column is also available. It consists of 2 x 30cm / 1ft column
extensions and a 60cm / 2ft Mounting Column. Assemble the column extension
between the column and the base dolly locking the 12 locking bolts securely.
Locking bolts
Column Extension
Base Dolly with 30cm / 1ft Column Extension
and 90cm / 3ft Mounting Column
Extended levelling
legs
3 stage mounting column
3 pivot heights are possible:
184cm / 6ft with all 3 parts
154cm / 5ft with a 30cm / 12inch column extension and mounting column
124cm / 4ft with Mounting Column.