44
4.5
CONTROL SYSTEM SERVICING
4.5.1
CONTROL BLOCK
See Section 1.9 for Bill of Materials.
a. Remove Strainer with an alley key and flush through with water in accordance with section
b. Remove the restrictor insert with a flat head screwdriver and inspect for any blockages.
c. On reassembly, it is recommended that the O-ring seals are lightly lubricated using a WRAS
approved grease.
Summary of Contents for NeoFlow DN200
Page 1: ...Operating instructions NeoFlow Pressure Reducing Valve DN200 DN300...
Page 10: ...10 1 7 BILL OF MATERIALS PRESSURE REDUCING ASSEMBLY...
Page 12: ...12 1 8 BILL OF MATERIALS VALVE BODY...
Page 23: ...23 2 2 2 PERMITTED VALVE ORIENTATIONS Horizontal Orientation Vertical Orientation...
Page 42: ...42...