Installation

 

 

X

Use 4 screws (5) to screw the side screen profile (4) provisionally to the square post at the top and bottom.

 

X

Shorten the side screen profile (4) at the top if necessary.

 

X

Adjust the position of the side screen profile (4) and square post (2) in relation to the door leaf, underlay to-

wards the wall if necessary.

 

à

The fixing and underlay material must be provided on site.

 

X

Unscrew the side screen profile (4).

 

X

Drill additional drill holes at a distance of ≤ 600 mm.

 

X

Mount the square post (2) with screws (3) on the wall.

 

X

Mount the side screen profile (4) with screws (5) on the square post (2).

 

X

Adjust the vertical position in relation to the door leaf.

 

 

X

Shorten the L-angle (6) if necessary.

 

X

Adjust the position of the L-angle (6) as cover blind and mark drill holes.

 

X

Drill the holes with a Ø 2.8 mm drill.

 

X

Screw to the side screen profile (4) using screws (7).

Summary of Contents for Hook bolt Lock A

Page 1: ...Automatic Hook Bolt Lock A EN Installation instructions 186500 00 ...

Page 2: ...installed system 5 2 5 Environmentally conscious working 5 2 6 Qualification 5 3 Overview 5 3 1 Diagrams 5 3 2 Tools and aids 6 3 3 Torques 6 4 Installation 7 4 1 Installing hook bolt lock A in the side screen profile 7 4 2 Installing the transmission element with ECdrive 12 4 3 Installing the transmission element with ECdrive T2 18 4 4 Installing the transmission unit with Slimdrive SL NT 23 4 5 ...

Page 3: ...ve T2 ECdrive T2 FR ECdrive ECdrive FR SL NT and SL NT FR from year of manufacture 2019 1 3 Product liability In compliance with the liability of the manufacturer for his products as defined in the German Product Liability Act compliance with the information contained in this brochure product information and intended use misuse product performance product maintenance obligations to provide informa...

Page 4: ...8650 2010 06 Building hardware Powered pedestrian doors à à VDE 0100 Part 610 2004 04 Installing Electrical Power Systems with Nominal Voltages up to 1000 V à à DIN EN 16005 2013 01 Power operated pedestrian doorsets safety in use Requirements and test methods à à DIN EN 60335 1 2012 10 Safety of electrical devices for home use and similar purposes Part 1 General requirements IEC 60335 1 2010 modi...

Page 5: ...or system separate the different materials and have them recycled à à Do not dispose of batteries and rechargeable batteries with household waste à à Comply with the statutory regulations when disposing of the door system and the batteries rechargeable batteries 2 6 Qualification Installation of the GEZE sliding door drive may only be carried out by experts authorised by GEZE 3 Overview 3 1 Diagra...

Page 6: ...15 mm Ring spanner 8 mm 10 mm Screwdriver set Slotted up to 6 mm cross slot PH2 or PZ2 Torx spanner T 20 T 25 Side cutting pliers Crimping pliers for cables Wire stripper Multimeter Installation tool Lock A Mat no 153719 Cable ties 2 5 approx 100 Metal drill Ø 2 8 mm 3 3 Torques The torques are given in the specific installation step the drive drawing and the leaf drawings ...

Page 7: ...Hook bolt Lock A 7 Installation 4 Installation 4 1 Installing hook bolt lock A in the side screen profile 4 1 1 Install the strike plate in the side screen 1 and 2 leaf ...

Page 8: ...ks are available in versions with single or double locking The illustration below shows the ver sion with double locking in the locked state 1 Side screen bolt 2 Upper hook bolt lock 3 Connecting link arm 4 Holder 5 Drive hook bolt lock 6 Lower hook bolt lock Factory setting The side screen bolts are delivered unlocked ...

Page 9: ...Hook bolt Lock A 9 Installation Preparation for installation version with one hook bolt lock 1 5 Nm ...

Page 10: ...Hook bolt Lock A 10 Installation Preparation for installation version with two hook bolt locks 1 5 Nm ...

Page 11: ...il the marking can be seen as shown in the diagram on the right The optimum position for the installation of the hook bolt locks has then been reached X X When installing two hook bolt locks make sure that the hooks of the driving rod catch the connecting link arm as shown below see arrows 2 5 Nm 2 5 Nm ...

Page 12: ...ssion element with ECdrive 4 2 1 ECdrive 1 leaf right hand slide to open X X Adjust the position of the stop buffer in closed position without rubber buffer after door installation and calibration When the door is closed the stop buffer must not be flush The distance should be about 1 mm Installing the spring mounted unit ...

Page 13: ...Hook bolt Lock A 13 Installation Installing the unit without spring mounting X X Move the moving leaf towards the closed position Closed position Open position ...

Page 14: ...Hook bolt Lock A 14 Installation Closed position ...

Page 15: ...th 2 leaf systems X X Install 2 additional stop buffers before installing the roller carriage in the centre of the system X X Install the stop buffers 3 in such a way that the rubber buffers 2 are not pointing towards the roller carriage 1 or X X Install the stop buffers on the main closing edge without rubber buffers The additional stop buffers protect the contacts when the door leaves are discon...

Page 16: ...Hook bolt Lock A 16 Installation Installing the unit without spring mounting X X Move the moving leaf towards the closed position Open position Closed position ...

Page 17: ...Hook bolt Lock A 17 Installation Closed position ...

Page 18: ...djust the position of the stop buffer in closed position without rubber buffer after door installation and calibration When the door is closed the stop buffer must not be flush The distance should be about 1 mm Installing the spring mounted unit X X Screw the spring mounted unit 1 to the buffer 2 1 2 Installing the unit without spring mounting ...

Page 19: ...Hook bolt Lock A 19 Installation X X Move the moving leaf towards the closed position Closed position Open position Closed position ...

Page 20: ...Hook bolt Lock A 20 Installation 4 3 2 ECdrive T2 1 leaf left hand slide to open 2 leaf Installing the spring mounted unit X X Screw the spring mounted unit 1 to the buffer 2 1 2 ...

Page 21: ...Hook bolt Lock A 21 Installation Installing the unit without spring mounting X X Move the moving leaf towards the closed position Open position Closed position ...

Page 22: ...Hook bolt Lock A 22 Installation Closed position ...

Page 23: ...smission unit with Slimdrive SL NT The illustrations below show the versions 2 leaf and 1 leaf left hand slide to open Implementation of the 1 leaf right hand slide to open version is reversed accordingly Installing spring mounted and non spring mounted unit ...

Page 24: ...st the position of the spring mounted unit and set up the cable connection between the moving leaf and the transmission unit X X Fit the plug connection together X X Insert the plug connection downwards into the HSK profile Closed position ...

Page 25: ...xing the cable X X Fix the cable using a cable tie 1 X X Route the cables in such a way that they do not catch on or rub against moving parts X X Insert the excess cable length and the plug connections in the side screen profile 2 Slimdrive SL NT ECdrive T2 1 2 1 2 ...

Page 26: ...below show the version 1 leaf left hand slide to open without side part Implementation of the 1 leaf right hand slide to open version is reversed accordingly X X Adjust the position of the door leaf 1 Heed safe distances to the light barrier profile side panel and floor X X Use 2 screws 3 to fix the square post 2 provisionally at the top and bottom X X Shorten the square post 2 if necessary ...

Page 27: ...he fixing and underlay material must be provided on site X X Unscrew the side screen profile 4 X X Drill additional drill holes at a distance of 600 mm X X Mount the square post 2 with screws 3 on the wall X X Mount the side screen profile 4 with screws 5 on the square post 2 X X Adjust the vertical position in relation to the door leaf X X Shorten the L angle 6 if necessary X X Adjust the positio...

Page 28: ...1 leaf system in front of a continuous wall left or right hand slide to open X X Adjust the position of the door leaf 1 Heed safe distances to the light barrier profile side panel and floor X X Adjust the position of the side screen profile 2 and wall rail 3 in relation to the door leaf 1 and mark on the wall X X Shorten the wall rail 3 if necessary or lever out the side plate on the post side if ...

Page 29: ...Hook bolt Lock A 29 Installation X X Mount the wall profile 3 with screws 4 on the wall underlay if necessary ...

Page 30: ...e side screen profile 2 with screws 5 through the wall profile 3 on the wall Adjusting the height in relation to the door leaf X X Adjust the position of the lower edge of the side screen profile post 2 to 4 mm below the side screen profile leaf 6 ...

Page 31: ... manually A tool with a diameter of approx 5 mm e g a Pozidrive screwdriver PZ1 is required for emergency activation Manual unlocking of Lock A X X Only unlock Lock A manually if electric unlocking is not possible Fault 53 is displayed when the voltage supply has been restored X X Set automatic mode of operation The fault is deleted ...

Page 32: ...Hook bolt Lock A 32 Installation Manual locking of Lock A X X Only lock Lock A manually if electric locking is not possible ...

Page 33: ... components if necessary X X Disassemble lock if necessary check for soiling and damage X X Check electric function X X Set transmission unit if necessary see Page 18 or Page 23 cable X X Check for correct attachment and any damage X X Fasten or replace cables or trans mission unit if necessary 6 Troubleshooting Cause of fault Remedy Bolt drive does not move smoothly X X Check the door leaf leaves...

Page 34: ...Hook bolt Lock A 34 Installation ...

Page 35: ...Hook bolt Lock A 35 Installation ...

Page 36: ...com cn France GEZE France S A R L E Mail france fr geze com www geze fr Hungary GEZE Hungary Kft E Mail office hungary geze com www geze hu Iberia GEZE Iberia S R L E Mail info geze es www geze es India GEZE India Private Ltd E Mail office india geze com www geze in Italy GEZE Italia S r l E Mail italia it geze com www geze it GEZE Engineering Roma S r l E Mail roma geze biz www geze it Poland GEZ...