48
I
NSTALLATION
TOWER VERSION
This chapter describes the work needed to prepare the UPS for use in tower version.
WARNING: for your own safety and that of your product, it is important that you follow the instructions
given below exactly.
BEFORE PROCEEDING TO PERFORM THE SEQUENCE OF
OPERATIONS DESCRIBED, MAKE SURE THAT THE UPS IS SWITCHED
OFF COMPLETELY AND IS NOT CONNECTED TO THE ELECTRICAL
MAINS OR LOAD OF ANY KIND
Once removed from its packaging, the UPS is already prepared for installation in tower configuration.
To complete the configuration, all that is needed is to fit the two plastic covers provided on the top part of
the UPS, as described below:
the 2 covers have a snap-fit fastening system:
identify the special holes for mounting of the covers in the top part
of the UPS and, taking the utmost care, fit the covers exerting a
slight pressure (see figure to the side).
Note: as the covers are perfectly identical, they can both be fitted
in either of the areas (front/back) on the top of the UPS without
any problem.
Summary of Contents for 3300 VA
Page 2: ......
Page 4: ...4...
Page 14: ...14...
Page 15: ...15 I MANUALE D USO I...
Page 40: ...40...
Page 41: ...41 GB USER S MANUAL GB...
Page 66: ...66...
Page 67: ...67 D BEDIENUNGSANLEITUNG D...
Page 92: ...92...
Page 93: ...93 F MANUEL D UTILISATEUR F...
Page 118: ...118...
Page 119: ...119 E MANUAL DE USUARIO E...
Page 144: ...144 0MNUMO4NPB...
Page 145: ......
Page 146: ...0MNUMO4NPB...