37
LRGT 1x-x - Installation & Operating Manual -
819877-00
Bringing into service
■
■
Before bringing into service, check that the conductivity transmitter is correctly connected.
■
■
Next, switch on the supply voltage.
Changing the factory settings if necessary
You will need the following tools
■
■
Slotted screwdriver, size 2.5
Notes for bringing into service for the first time
When the equipment is brought into service for the first time, the scale of the current output
is set to 500 µS = 20 mA for the LRGT 1x-3 and 7000 µS = 20 mA for the LRGT 16-4.
After installation, first change the scale to suitable values for your specific plant.