www.glp.de
16
GT-1 User Manual
4.
Preparation for use
Warning!
Read the chapter headed ‘Safety’ starting on page 5 before installing the
GT-1.
Included items
The GT-1 package includes a floor stand, a power cord with PowerCON connector, and
two M10 x 25 countersunk bolts for fastening half-couplers.
Cardboard packaging
To remove a GT-1 from cardboard packaging, open the top of the box and remove the
floor stand and upper piece of foam packing material. Use the cutouts in the lower
piece of foam located by the yoke and base to place hands under fixture. Lift fixture
straight up, out of box, and lower gently onto workspace.
Flightcase
To remove a GT-1 from a flightcase, mount two omega brackets with handles to the
base. The brackets mount with two Camlock quarter-turn pins. Line up and insert the
pins into the base and turn 90° clockwise to lock. Lift the fixture straight up, out of the
flightcase, and lower gently onto workspace.
Mounting
The GT-1 may be rigged in any orientation or placed on a stable horizontal surface.
Warning!
When installing, keep the head of the fixture at least 0.5 m (20 in.) from
flammable materials including curtains and stage scenery. Secure the fixture with a
safety cable as described on page 17.
Figure 5. Mounting Options
Summary of Contents for GT-1
Page 1: ...User Manual Fixture software version 92 ...
Page 38: ......
Page 39: ......
Page 40: ......