5. INSTALLATION OF THE AUTOMATED SYSTEM

5.1.

PRELIMINARY CHECKS

To ensure trouble-free operation of the automated system,

make sure that the structure of the existing gate or the gate

to be installed, complies with the following requirements:

max. single leaf length up to 2 metres (with V and VR

operator versions);

max. single leaf length up to 3.5 metres (with L and LR

operator versions);

sturdy and rigid leaf structure;

proper and uniform movement of the leaves, without

any irregular friction during their entire travel;

good condition of existing hinges;

presence of mechanical stops.

presence of the electric lock for the reversing version.

presence of an efficient earthing for the electric

connection of the operator.

We advise you to carry out any metalwork jobs before

installing the automated system.

The condition of the structure directly affects the reliability

and safety of the automated system.

5.2.

INSTALLATION OF THE OPERATORS

1) Secure the rear bracket on the pillar according to the

instructions of 

Dwg. A

. If necessary, change the length

of the supplied bracket. Any securing errors may be

remedied thanks to 4 securing holes on the rear bracket.

Attention

: observe the indicated dimensions in order not

to endanger the operator efficiency.
In case of iron pillar, carefully weld the bracket directly

on the pillar (Fig. 4).

In case of masonry pillar, use the optional plate for a

securing to wall or to be bolted (Fig. 4).
 Then carefully weld the bracket on the plate.

Table A: Recommended dimensions ( in mm.)

(¹) stem useful travel      (²) max. dimension        (³) min. dimension

GENERAL RULES TO DETERMINE

THE INSTALLATION DIMENSIONS

If the dimensions indicated in table A cannot be realized,

the following must be taken into consideration in order to

determine different measures:
-

to get 

90° leaf opening: a + b = c

-

to get 

leaf opening over 90°: a + b < c

-

lower a and b dimensions determine higher speed

.

Current standards have to be complied with.

-

limit the difference of the dimensions a and b within

4 cm

: higher differences cause high speed variations

during the opening and closing movement.

-

due to the operator overall dimensions, the 

min. Z

dimension is 80 mm 

(Fig. A).

-

with the 

LS

 versions, dimensions 

A

 and 

B

 must be

used as they enable use of the entire travel. Shorter

travel distances could limit or reduce  the limit-

switch adjustment range to zero.

-

If the pillar dimensions or the hinge position make it

impossible to keep the dimensions 

a

 within the

desired measure, a niche on the pillar is to be

executed as shown in Fig. B.

-

in the LS versions, the limit-switches are tripped only

during the first and last 25 mm of travel. As a result,

the full travel distance C must be used.

Skill

L-V-LR-VR

A

B

C (¹)

D (²)

Z (³)

L

α

αα

αα

90°

110°

130

305

305

75
60

60
60

830
830

150

150
130

Dwg. A

INSTALLATION DIMENSIONS

Model

Summary of Contents for Skill 01

Page 1: ...Skill 01 ...

Page 2: ... dans une atmosphère explosive la présence de gazoudefuméesinflammablesconstitueungravedangerpourlasécurité 8 LescomposantsmécaniquesdoiventrépondreauxprescriptionsdesNormes EN 12604 et EN 12605 PourlesPaysextra CEE l obtentiond unniveaudesécuritéappropriéexige nonseulementlerespectdesnormesnationales maiségalementlerespect desNormessusmentionnées 9 GENIUSn estpasresponsabledunon respectdelaBonneT...

Page 3: ... t s u r h T N a d 0 8 1 N a d 0 0 2 l e v a r T m m 5 0 3 d e e p S c e s m c 4 1 c e s m c 2 1 f a e l x a M m 2 m 5 3 C 0 2 y c n e u q e r f e s U 0 3 3 S C 0 2 s e l c y c e v i t u c e s n o C 5 1 t n e i b m a g n i t a r e p O e r u t a r e p m e t C 5 5 C 0 2 s s a l c n o i t c e t o r P 4 4 P I t h g i e w r o t a r e p O g k 4 8 s n o i s n e m i d r o t a r e p O 2 g i f e e s L E D O...

Page 4: ...In case of iron pillar carefully weld the bracket directly on the pillar Fig 4 In case of masonry pillar use the optional plate for a securing to wall or to be bolted Fig 4 Then carefully weld the bracket on the plate Table A Recommended dimensions in mm stem useful travel max dimension min dimension GENERAL RULES TO DETERMINE THEINSTALLATIONDIMENSIONS IfthedimensionsindicatedintableAcannotbereali...

Page 5: ...leaf movement is regular and without any friction whatever 8 Completely weld the front bracket on the leaf Fig 8 To do this temporarily release the operator from the fitting in order to avoid that welding slag damage it Note We recommend to grease every fixing pin of the fittings 9 Carry out the installation of the second operator if any repeating the above mentioned operations 10 Install the encl...

Page 6: ...ockwise close the cover and switch on power to the system Carry out some manoeuvres in order to check if all functions of the automated system have been correctly restored 10 MECHANICAL STOP TheSKILLoperatorisequippedwithanopeningmechanical stop Fig 10 which can be adjusted according to need Procedure for adjusting the stop position 1 Release the operator as described in point 8 2 Manually take th...

Page 7: ...sitioned If the limit switches have to be adjusted again resume from point 2 5 Re fit the lower housing 12 MAINTENANCE To ensure correct long term operation we advise you to carry out the following checks every six months 1 Check if all the safety devices in use are connected and efficient 2 Check if the anti crushing clutch is correctly set 3 Check the condition and efficiency of the earth connec...

Page 8: ...DE CONFORMITÉ DIRECTIVEEUROPÉENNE MACHINES 89 392 CEE ANNEXEII PARTIEB Fabricant GENIUS s r l Adresse Via Padre Elzi 32 24050 Grassobbio BERGAMO ITALIE Déclare d une part que l automatisme mod SKILL 01 estprévuesoitpourêtreincorporéedansunemachine soit pour être assemblée avec d autres composants ou parties en vue de former une machine selon la directiveeuropéenne machines 89 392CEE modifiée 91 36...