5.3 BASE PLATE

RISKS

PERSONAL PROTECTIVE EQUIPMENT

Before proceeding, check that the necessary conduits are in place (§ 
4.3-

5

).

The base plate and corresponding hardware are accessories which are 
not included.

1.  Assemble the base plate as shown in 

11

; tighten the supplied 

M10 nuts and locknuts, using two hex spanners.

2.  Pour a slab, with reference to 

6

 and 

7

 in § 5.2 and 

12

.

3.  Take the cable conduits out from the hole (

12

-1) and install 

the base plate.

Do not bury the base plate in the concrete.

4.  Use a spirit level to check that the slab is horizontal, making any 

corrections before the concrete goes off (

12

).

5.4 FASTENING THE GEAR MOTOR

RISKS

PERSONAL PROTECTIVE EQUIPMENT

Wait for the concrete to cure fully before proceeding.

!

Lift the gear motor, holding it by the base.

1.  Pass the cables through the two holes on the gear motor (

13

-1).

2.  Position the gear motor, lining up the slots and the screws on the 

plate (

13

-2).

3.  Pass the cables through the supplied cable glands, then insert the 

cable glands in the holes (

13

-3).

!

If one of the two holes will not have cables running through it, insert 
the plastic cable gland whole.

Foundation

Steel rack

Summary of Contents for BLIZZARD 500

Page 1: ...BLIZZARD 500 BLIZZARD 900 Translation of the original instructions...

Page 2: ...All names and trademarks mentioned are the property of their respective manufac turers Customers may make copies exclusively for their own use This manual was published in 2018 Copyright FAAC S p A de...

Page 3: ...g 17 6 2 Installation of the Limit Switches 17 6 3 Final Operations 18 7 MAINTENANCE 18 7 1 Scheduled Maintenance 19 8 INSTRUCTIONS FOR USE 20 8 1 Safety recommendations 20 8 2 Product Warnings 20 8 3...

Page 4: ...They are therefore required by law among other things to carry out a risk analysis of the machine automatic gate in its entirety and take protective measures to fulfil the essential safety requiremen...

Page 5: ...ts Do not modify the original components in any way Close off the work site even temporarily and prevent access tran sit EC countries must comply with the legislation that transposes the European Cons...

Page 6: ...ted in the leaf of the gate themotorisedmovementmustbedisabledwhenthepedestriangate is not in a safe position The installation must be visible during the day and at night If it is not appropriate solu...

Page 7: ...kg 900 kg Sliding gate section speed 12 m min 14 m min 12 m min 14 m min Ambient operating temperature 20 C 55 C 20 C 55 C 20 C 55 C 20 C 55 C Type of use Residentialbuildings Apartment complexes Res...

Page 8: ...are accessories 3 Electric motor 4 Magnetic limit stop sensor 5 Magnetic limit switches 6 Release device 7 Start up capacitor 8 Earth connection 9 Z16 Module 4 pinion 7 Installation Accessories 1 Base...

Page 9: ...tec tive elements that prevent fingers from being introduced Presence of a safety area between the paving and lower edge of the leaf along its entire path providing protection from the risk of feet be...

Page 10: ...ifiedE g 6mmhexspannersetto2 5Nm 6 2 5 Nm ELECTRICIAN S SCISSORS 6 5 5 5 3 6 HSS DRILL BIT of specified sizes M8 THREAD CUTTER of specified sizes for steel rack to be screwed on SPIRIT LEVEL 4 3 EXAMP...

Page 11: ...8 18 90 0 50 50 7 90 0 50 95 288 132 50 6 288 132 Translation of the original instructions ENGLISH POSITIONING THE RACK 5 2 INSTALLATION DIMENSIONS POSITIONING THE BASE PLATE CENTRELINE DISTANCES Foun...

Page 12: ...nduits out from the hole 12 1 and install the base plate Do not bury the base plate in the concrete 4 Use a spirit level to check that the slab is horizontal making any corrections before the concrete...

Page 13: ...g automatic operation A lock with personalised key is available as an optional accessory MANUAL RELEASE 1 Open the plastic cap on the release device 15 1 2 Turn the lock clockwise using a coin or your...

Page 14: ...level then weld the other two spacers repeating the operations in steps 5 and 6 7 If necessary install another rack section as in step 1 8 Rest the section on the pinion bringing it up to the previou...

Page 15: ...use another rack section rest it on the pinion bring ing it up to the previous one use a third section screw clamps and a spirit level to line up the teeth and check it is level 21 8 Install the sect...

Page 16: ...er away from the slot 25 5 7 ADJUSTMENTS AND CHECKS RISKS PERSONAL PROTECTIVE EQUIPMENT The operations described in this section are fundamentally important to the integrity and operation of the gear...

Page 17: ...capacitor supplied between the two phases of the electric motor 6 Connect the other accessories to the electronic board not sup plied 7 Connect the mains power supply cable to the electronic board an...

Page 18: ...he machine and the system Logbook 7 Providetheowner operatoroftheautomationwiththeECDecla ration the system Logbook with the maintenance schedule and the user instructions of the automation INSTALLING...

Page 19: ...y 12 Check that the hand guard around the pinion is present and intact 12 Check that it is irreversible 12 Check that there is no loss of grease 12 Checktheconditionofthegearmotorcables thecableglands...

Page 20: ...andmentalhealthandbeawareof andresponsibleforthedangerswhichuseoftheproductcanleadto Do not remain in or walk drive through the area of operation of the automation system while it is moving Do not use...

Page 21: ......

Page 22: ...Sede legale FAAC S p A Soc Unipersonale Via Calari 10 40069 Zola Predosa BOLOGNA ITALY Tel 39 051 61724 Fax 39 051 09 57 820 www geniusg com BLIZZARD 500 900 22 532102 Rev B...

Reviews: