![Genie TMZ-34/19 Service Manual Download Page 94](http://html1.mh-extra.com/html/genie/tmz-34-19/tmz-34-19_service-manual_2211929094.webp)
REV B
Section 4 • Repair Procedures
June 2005
4 - 50
TMZ-34/19
Part No. 52075
OUTRIGGER COMPONENTS
5 Attach a lifting strap from an overhead crane to
the lug on the rod end of the cylinder.
6 Remove the pin retaining fasteners from
outrigger cylinder rod-end pivot pin.
7 Place a rod through the hole in the outrigger
cylinder rod-end pivot pin and twist to remove
the pin. Remove the outrigger cylinder rod-end
pivot pin from the machine.
8 Raise the cylinder to a vertical position.
9 Remove the pin retaining fasteners from the
outrigger cylinder barrel-end pivot pin.
10 Place a rod through the hole in the outrigger
cylinder barrel-end pivot pin and twist to
remove the pin. Remove the outrigger cylinder
barrel-end pivot pin from the machine.
Crushing hazard. The outrigger
cylinder could fall if not properly
supported when the pivot pin is
removed from the machine.
Component damage hazard. The
solenoid valve can be damaged.
Use caution when removing the
cylinder from the machine.
a
valve coil (hidden from view)
b
outrigger cylinder
b
a
800-610-4101
ActionRental.com